Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. CO 52 Planning and Environmental Linkages (PEL) & Access Control Plan (ACP)
  4. Assets
Resources
  • Home
  • Study Schedule
  • About the PEL Process
  • Access Control Plan
  • Public Involvement
  • Frequently Asked Questions
  • Study Documents & Reports

Assets https://www.codot.gov/projects/co52-pel-acp/assets https://www.codot.gov/@@site-logo/siteLogo.png

Assets

PEL-June2022-MainText.pdf
B. Access Control Plan Report.pdf
I. Agency Coordination and Public Engagement Report.pdf
H. Project Categorization Table.pdf
F. Technical Memos.pdf
G. Alternative Matrices.pdf
I. Agency Coordination and Public Engagement Report (1).pdf
H. Project Categorization Table (1).pdf
G. Alternative Matrices (1).pdf
F. Technical Memos (1).pdf
E. Existing Conditions Report (1).pdf
D. FHWA PEL Questionnaire (1).pdf
C. FHWA Check-in Points (1).pdf
B. Access Control Plan Report (1).pdf
A. Letters of Support (1).pdf
  • Previous 20 items
  • 1
  • 2
  • 3

Stay Informed

CDOT Travel Alerts icon

Initial Issues

Develop alternatives to consider hazardous materials trucks along corridor


Maintain working relationships with communities along the corridor


Identify future grant opportunities for projects


Prepare one ACP for the corridor


ROW preservation for future transportation projects


Standard shoulder width throughout the corridor


Effective project communications


Information to lay the foundation for improving safety and the functional integrity of SH 52


Prioritize safety issues along the corridor


Consider safety issues at SH 52 and Glen Creighton

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo