Previous Planning Efforts

For access to these documents, please contact the project team at [email protected].

  • CO 7 Station Area Concept Design
  • I-25 & CO 7 Mobility Hub Concept Design
  • CO 7 Corridor Development Plan (2021)
  • CO 7 Bus Rapid Transit Feasibility Study (2018)
  • East Arapahoe Transportation Plan (2018)
  • CO 7 Planning and Environmental Linkage Study (2018) | 75th Street to US 287
  • CO 7 Planning and Environmental Linkage Study (2014) | US 287 to US 85