CO 82/CO 133 Signal Replacement Project

Project Facts

  • Cost: $2.5 Million
  • Contractor: Casper Electric
  • Timeline: May - November 2021
  • Location: CO 82 at 11th Street and 14th Street and CO 133 at Meadowood Drive and Village Road (MP 66.05 to MP 68.82)

About the Project:

Work will include the removal and installation of traffic signal equipment, poles, mast arms, pedestrian push buttons, signing and vehicle detection upgrades. Crews will also install 16 Americans with Disabilities Act (ADA) compliant curb ramps. The new ramps will be in compliance with the Public Right of Way Accessibility Guidelines (PROWAG) requirements and will provide functional accessibility to all travelers using our state and US highways.