Projects

CO 83 Concrete Panel Replacement E-470 to Arapahoe Road

Project Facts

  • Cost: $2.1 Million
  • Contractor: R. L. Wadsworth
  • Timeline: March - November 2021
  • Location: CO 83 from E-470 to Arapahoe Road in Arapahoe and Douglas Counties

CO 83 Concrete Panel Replacement Project MapCO 83 Concrete Panel Project Limits

(Click image to enlarge)

About the Project:

The Colorado Department of Transportation and contractor, Ralph L. Wadsworth will begin work to improve several sections of roadway along CO 83 from E-470 to Arapahoe Road. Work will include removal and replacement of damaged concrete panel, ADA curb ramp improvements, guardrail improvements, and joint sealing to minimize the effects of surface water infiltration.


Work Schedule & Traffic Impacts

Motorists can expect periodic lane closures along this corridor with minor traffic delays.

  • Daytime work will occur Monday through Friday from 9 a.m. to 7 p.m.
  • When needed night work will occur Sunday through Thursday nights between the hours of 7 p.m. and 8 a.m.
  • Occasional weekend work may occur.
  • Variations to this may occur due to unforeseen circumstances and weather