Drew Dix Parkway Dillon Drive at I-25 Interchange

About the Project:

This safety and mobility improvement project will construct a roundabout at the intersection of Drew Dix Parkway and the west frontage road. The southbound I-25 off-ramp at Drew Dix Parkway (exit 104) will be realigned to utilize the new roundabout.

The east frontage road will be built between Drew Dix Drive and Dillon Parkway. This new connection will run parallel to northbound I-25 between the existing roundabout at Dillon Drive and the Drew Dix Parkway / northbound I-25 on-ramp intersection.

 
Project Benefits:

  • Better circulation between Drew Dix Parkway, Dillon Drive and I-25
  • Roundabout intersection design improves safety
  • Completion of ultimate design concept partially constructed in 2016 as part of the Dillon Drive Interchange Project

Major work items:

  • New roundabout at Drew Dix Parkway, west frontage road, southbound I-25 off-ramp intersection
  • Frontage road construction east of I-25 between Dillon Drive and Drew Dix Parkway including a new bridge
  • Drainage improvements including a new concrete box culvert
  • New sidewalk connections
  • Lighting improvements
  • Signing and striping
  • Guardrail installation

Work Schedule:

  • The project will be in a winter shutdown from late January to Summer 2024
  • Infrequent night and weekend work may be necessary for some construction activities

Traffic Impacts:

  • No traffic impacts are expected from late January to mid-April 2024
  • Finishing work in spring 2024 will require traffic shifts
  • Through traffic on I-25 is not impacted
  • Access to all properties will be maintained during construction

Work this Week & Lane Closures
Drew Dix Parkway Dillon Drive at I-25 Interchange

Project Facts

  • Cost: $10 Million
  • Contractor: SEMA
  • Timeline: March 2023 - Summer 2024
  • Location: Drew Dix Parkway/Dillon Drive at I-25, Pueblo County

Drew Dix Dillon I-25 Project Overview Map

View the Drew Dix March 15 Information Session Exhibit Boards