I-70 Glenwood Canyon Emergency Project

About the Project:

This is an emergency project resulting from damage caused by the July 29, 2021 material flows in Glenwood Canyon. Work includes but is not limited to parapet and retaining walls repairs and replacement. Guardrail replacement, culvert repairs, and roadway resurfacing; both polyester concrete and hot mix asphalt. Work will also clear the debris on the recreation path and assess the damage.

Read about the Glenwood Canyon Mudslides


Traffic Impacts

  • An extended single lane closure remains in place at MP 123.5. Eastbound is 1.5 miles long to Hanging Lake Tunnel and westbound is a ½ mile closure. There is a 11’ width restriction in place for commercial vehicles through Glenwood Canyon. 

Glenwood Canyon Emergency Repairs in progress

Reconstruction of the eastbound retaining wall at MP 123.5.s

Project Facts

  • Cost: $6.1 Million
  • Contractor: Lawrence Construction
  • Timeline: August - December 2021
  • Location: I-70 Glenwood Canyon from mile point 116 (Glenwood Springs) to mile point 133 (Dotsero). Concentrated work at mile point 123.5/Blue Gulch just two miles west of Hanging Lake Tunnel.

Outlet cleanup at MP 123.5

Outlet cleanup at MP 123.5