CO 30/Gun Club Rd. Widening at Hampden
About the Project:
The project will consist of installing a right turn lane from southbound Gun Club Road onto westbound Hampden Ave. Additionally, crews will make minor improvements to the signals, as well as the drainage infrastructure of the field next to the intersection. Work will take place at this intersection and the stretch of roadway leading up to the intersection.
Project Benefits
- The project will improve and prolong the life of the roadway, as well as reduce delays.
- Additionally, this turn lane will increase safety by adding a dedicated space for vehicles to slow down and make a safe turn.
Work Schedule:
Work will take place primarily during the day Monday - Friday from 7 a.m. to 3 p.m.
- Daytime closures are not expected at this time.
- The majority of work will take place behind a protective barrier which will be
set at night. - This project is expected to be completed on October 20, 2023.
Traffic Impacts:
- There will be occasional nighttime single-lane closures.
- Weekend closure times: 7 p.m. to 9 a.m.
- Weeknight closure times: 8 p.m. to 6 a.m.
- Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures
Gun Club Road Construction
Project Facts
- Construction Cost: $5 Million
- Contractor: RDZ Build
- Timeline: August 28 through October
- Location: Intersection of CO 30 and US 285
- Nearest Town/City: Denver
- Mile Point(s): CO 30 MP 19.45
- County: Arapahoe