I-25 and Erie Parkway Ramp Signalization

About the Project

 On Monday, March 30, 2020, Colorado Department of Transportation will begin work to signalize the on/off ramps at I-25 and Erie Parkway interchange. This will include installation of signal poles, mast arms, controller cabinets, fiber infrastructure, cameras and other infrastructure needed for the signalization. This project was contracted to Sturgeon Electric Company, Inc. for $756,000.

In 2017 a signal warrant study determined a traffic signalization of the on/off ramps would improve the overall safety and operations of this intersection.   

Project Facts

  • Cost: $756,000
  • Contractor: Sturgeon Electric
  • Timeline: March - October, 2020
  • Location: I-25 and Erie Parkway
    (CR 8) in Weld County

I-25 Frontage Road & Erie Pkwy Ramp Signalization Mao

(See larger map image below)



Proposed Work Schedule

  • Work at this intersection is scheduled to begin on Monday, March 30. Work is expected to be completed by Fall 2020
  • Normal work hours will be from 7 a.m. to 3:30 p.m., Monday through Friday.

Traffic Impacts

All motorized vehicles should expect travel impacts throughout the construction of this project.

  • Motorists should be aware of lane closures and lane shifts in the intersections.
  • Motorists are urged to obey speed reductions and watch for construction personnel and equipment in the work zone.