Sidewalks

The Central 70 Project is improving connectivity not just for motorists, but for pedestrians and cyclists, too! Nearly seven miles of sidewalk will be added throughout the 10-mile corridor. A signed bike route will be added along Dahlia Street under I-70 to join with the D-15 bicycle signed route. Disabled access ramps are being installed throughout the project at intersections as a part of the Americans with Disabilities Act (ADA). These ramps allow wheelchairs, strollers and carts to get on and off of sidewalks.

Below is a list of resources available for further information:

Map of future sidewalks on the Central 70 Project