Anticipated Traffic Impacts
During construction, motorists can expect:
- Major rock scaling and blasting operations requiring traffic holds are complete. Rock blasting may still be required as work progresses and if unexpected rock is encountered.
- If rock blasting operations are required, motorists can expect daytime 20-minute traffic holds on I-70, resulting in delays of up to 45 minutes from 9 a.m. to 3 p.m. on Mondays through Thursdays, and 9 a.m. to noon on Fridays.
- Holds can also occur on Central City Parkway, County Road 314, US 6 and US 40.
- Be sure to sign up for text alerts to receive notice about these operations by texting ‘floydhill’ to 21000.
- Daytime and nighttime single and double lane closures
- Temporary traffic shifts resulting in new traffic patterns
- Temporary on- and off-ramp closures
- Periodic overnight detours in the I-70/US 6 interchange and short-term closures of I-70 for safety critical work
- Reduced speed limit as low as 45 MPH through the work zone
- Narrower lanes and shoulders adjacent to concrete barrier
- Trucks entering and exiting the work zone (do not follow them into the work zone)
- Long-term closure of the Clear Creek Greenway Trail
Efforts to keep I-70 moving during construction include:
- Keeping all lanes and ramps open during peak travel hours
- Ensuring lane closures are responsive to current traffic patterns
- Innovating complex work above the roadway so it doesn’t impede traffic
- Building new roadway sections adjacent to current lanes to keep traffic moving
- Coordinating with nearby and other I-70 Mountain Corridor projects
- Coordinating and meeting regularly with emergency first responders
- Providing emergency pull-off areas
- Promoting the use of transit and carpool options to reduce low occupancy vehicles on I-70