Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor
  4. I-70 Mountain Corridor - Old Project 2004-2010
  5. old-project-assets
Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Mountain Corridor
    • I-70 Mountain Corridor Projects and Studies
    • I-70 Mountain Corridor
    • Collaborative Effort
    • I-70 Revised Draft PEIS
    • Corridor News
    • Newsletters
    • Context Sensitive Solutions (CSS)
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • Interstate 70 - Twin Tunnels
    • Interstate 70 Frontage Road - East of Idaho Springs
    • Transit and Rail Program
    • CE Meeting Documents
    • I-70 Mountain Corridor Traffic and Revenue Study
    • September 29 Minutes.pdf
    • I-70 Mountain Corridor - Old Project 2004-2010
      • Collaborative Effort
      • Final I-70 PEIS
      • Final PEIS File Download
      • old-project-assets
        • i-70 Mountain Corridor Header
        • i-70 Badge
        • Consensus Document
        • Consensus Letter
        • CE Membership List
        • CE Operating Protocols
        • CE Meeting Schedule
        • CE Close Out Report
        • CE Flow Chart
        • August 2010 Newsletter
        • February 2011 Newsletter
        • June 2011 Newsletter
        • Final ROD text
        • Final ROD Appendix A
        • Final ROD Appendix B
        • Clear Creek SCAP Final Report
        • CDOT I 70 SCAP Mapbook
        • I-70 Wildlife Overpass Screening Report
old-project-assets https://www.codot.gov/projects/i70mountaincorridor/i-70-old-mountaincorridor/oldassets https://www.codot.gov/@@site-logo/siteLogo.png

old-project-assets

i-70 Mountain Corridor Header
i-70 Badge
I-70 Revised Draft PEIS October 2010 Public Hearings
2010 Revised Draft PEIS

I-70 Public Comments
Repository Locations
CE Meeting Documents
Consensus Document
Consensus Letter
CE Membership List
CE Operating Protocols
CE Meeting Schedule
CE Close Out Report
CE Flow Chart
August 2010 Newsletter
February 2011 Newsletter
June 2011 Newsletter
Final ROD text
Final ROD Appendix A
Final ROD Appendix B
  • 1
  • 2
  • Next 6 items

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo