Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor
  4. I-70 Mountain Corridor - Old Project 2004-2010
  5. old-project-assets
  6. 2010 Revised Draft PEIS
Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Mountain Corridor
    • I-70 Mountain Corridor Projects and Studies
    • I-70 Mountain Corridor
    • Collaborative Effort
    • I-70 Revised Draft PEIS
    • Corridor News
    • Newsletters
    • Context Sensitive Solutions (CSS)
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • Interstate 70 - Twin Tunnels
    • Interstate 70 Frontage Road - East of Idaho Springs
    • Transit and Rail Program
    • CE Meeting Documents
    • I-70 Mountain Corridor Traffic and Revenue Study
    • September 29 Minutes.pdf
    • I-70 Mountain Corridor - Old Project 2004-2010
      • Collaborative Effort
      • Final I-70 PEIS
      • Final PEIS File Download
      • old-project-assets
        • i-70 Mountain Corridor Header
        • i-70 Badge
        • Consensus Document
        • Consensus Letter
        • CE Membership List
        • CE Operating Protocols
        • CE Meeting Schedule
        • CE Close Out Report
        • CE Flow Chart
        • August 2010 Newsletter
        • February 2011 Newsletter
        • June 2011 Newsletter
        • Final ROD text
        • Final ROD Appendix A
        • Final ROD Appendix B
        • Clear Creek SCAP Final Report
        • CDOT I 70 SCAP Mapbook
        • I-70 Wildlife Overpass Screening Report
        • 2010 Revised Draft PEIS
          • 2010 Revised Draft PEIS
          • Table of Contents
          • Executive Summary
          • Technical Reports
          • Appendices
2010 Revised Draft PEIS https://www.codot.gov/projects/i70mountaincorridor/i-70-old-mountaincorridor/oldassets/2010-revised-draft-peis https://www.codot.gov/@@site-logo/siteLogo.png

2010 Revised Draft PEIS

2010 Revised Draft PEIS

64MB - Complete Document

Table of Contents
Executive Summary
Technical Reports
Appendices

17MB


Tags:
  • I-70 Mtn Corridor
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo