Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor
  4. I-70 Mountain Corridor - Old Project 2004-2010
  5. old-project-assets
  6. Final PEIS Documents
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Denver Metro Bridge Safety Improvements
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • I-70 Mountain Corridor
    • I-70 Mountain Corridor Projects and Studies
    • Collaborative Effort
    • I-70 Revised Draft PEIS
    • Corridor News
    • Newsletters
    • Context Sensitive Solutions (CSS)
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • Interstate 70 - Twin Tunnels
    • Interstate 70 Frontage Road - East of Idaho Springs
    • Transit and Rail Program
    • Collaborative Effort Meeting Documents
    • I-70 Mountain Corridor Traffic and Revenue Study
    • I-70 Mountain Corridor - Old Project 2004-2010
      • Collaborative Effort
      • Final I-70 PEIS
      • Final PEIS File Download
      • old-project-assets
        • i-70 Mountain Corridor Header
        • i-70 Badge
        • Consensus Document
        • Consensus Letter
        • CE Membership List
        • CE Operating Protocols
        • CE Meeting Schedule
        • CE Close Out Report
        • CE Flow Chart
        • August 2010 Newsletter
        • February 2011 Newsletter
        • June 2011 Newsletter
        • Final ROD text
        • Final ROD Appendix A
        • Final ROD Appendix B
        • Clear Creek SCAP Final Report
        • CDOT I 70 SCAP Mapbook
        • I-70 Wildlife Overpass Screening Report
        • Final PEIS Documents
          • Complete Document
          • Appendix A, CSS
          • Appendix B, Section 106
          • Appendix C, Consensus
          • Appendix D, SWEEP
          • Appendix E, ALIVE
          • Appendix F, Response
Final PEIS Documents https://www.codot.gov/projects/i70mountaincorridor/i-70-old-mountaincorridor/oldassets/final-peis-documents https://www.codot.gov/@@site-logo/siteLogo.png

Final PEIS Documents

Complete Document

57MB

Appendix A, CSS
Appendix B, Section 106

6MB

Appendix C, Consensus
Appendix D, SWEEP

9MB

Appendix E, ALIVE

10MB

Appendix F, Response

61MB

Technical Reports
Individual Files

Tags:
  • I-70 Mtn Corridor
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo