Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor
  4. I-70 Mountain Corridor - Old Project 2004-2010
  5. old-project-assets
  6. Final PEIS Documents
  7. Individual Files
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 207 & CO 266 Resurfacing
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 138 Logan County Widening Project
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • CO 88/Belleview Traffic Safety Project
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 CCTV Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • I-25 Acceleration/Deceleration Lanes Fillmore Street to Garden of the Gods Road
  • CO 392 Weld County Safety Project
  • US 50B Drainage Improvements east of Swink
  • I-70 Mountain Corridor
    • I-70 Mountain Corridor Projects and Studies
    • Collaborative Effort
    • I-70 Revised Draft PEIS
    • Corridor News
    • Newsletters
    • Context Sensitive Solutions (CSS)
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • Interstate 70 - Twin Tunnels
    • Interstate 70 Frontage Road - East of Idaho Springs
    • Transit and Rail Program
    • Collaborative Effort Meeting Documents
    • I-70 Mountain Corridor Traffic and Revenue Study
    • I-70 Mountain Corridor - Old Project 2004-2010
      • Collaborative Effort
      • Final I-70 PEIS
      • Final PEIS File Download
      • old-project-assets
        • i-70 Mountain Corridor Header
        • i-70 Badge
        • Consensus Document
        • Consensus Letter
        • CE Membership List
        • CE Operating Protocols
        • CE Meeting Schedule
        • CE Close Out Report
        • CE Flow Chart
        • August 2010 Newsletter
        • February 2011 Newsletter
        • June 2011 Newsletter
        • Final ROD text
        • Final ROD Appendix A
        • Final ROD Appendix B
        • Clear Creek SCAP Final Report
        • CDOT I 70 SCAP Mapbook
        • I-70 Wildlife Overpass Screening Report
        • Final PEIS Documents
          • Complete Document
          • Appendix A, CSS
          • Appendix B, Section 106
          • Appendix C, Consensus
          • Appendix D, SWEEP
          • Appendix E, ALIVE
          • Appendix F, Response
          • Individual Files
            • Front Matter
            • Executive Summary
            • Introduction
            • Chapter 1
            • Chapter 2
            • Chapter 3
            • Chapter 4
            • Chapter 5
            • Chapter 6
            • Glossary
            • List of Preparers
            • Index
            • References
            • Distribution List
Individual Files https://www.codot.gov/projects/i70mountaincorridor/i-70-old-mountaincorridor/oldassets/final-peis-documents/individual-files https://www.codot.gov/@@site-logo/siteLogo.png

Individual Files

Front Matter
Executive Summary
Introduction
Chapter 1
Chapter 2

19MB

Chapter 3
Chapter 4
Chapter 5
Chapter 6
Glossary
List of Preparers
Index
References
Distribution List

Tags:
  • Project: I-70 Mountain Corridor
Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo