Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor Context Sensitive Solutions
  4. Assets
  5. Documents
  6. Aesthetics
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 207 & CO 266 Resurfacing
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 138 Logan County Widening Project
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • CO 88/Belleview Traffic Safety Project
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 CCTV Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • I-25 Acceleration/Deceleration Lanes Fillmore Street to Garden of the Gods Road
  • CO 392 Weld County Safety Project
  • US 50B Drainage Improvements east of Swink
  • I-70 Mountain Corridor Context Sensitive Solutions
    • Context Statement
    • Core Values
    • Decision Making
    • Design
    • CSS on the I-70 Corridor
    • Glossary
    • What's New on the I-70 Mtn Corridor
    • Context Sensitive Solutions (CSS) Overview
    • Context Sensitive Solution Team Roles and Responsibility.pdf
    • I70 view 1 with logo.png
    • Assets
      • sprite decision
      • home widget map
      • homepage video
      • homepage lifecycle
      • homepage decision
      • banner design4
      • banner design3
      • banner design2
      • banner design1
      • Homepage 4
      • Homepage 3
      • Homepage 2
      • Homepage 1
      • Homepage
      • Life Cycle Phases
      • 6 step process
      • Photo Library
      • Context Sensitive Solution Process_Visual Information.JPG
      • Slide2.PNG
      • Context Sensitive Solution Team Roles and Responsibility.pdf
      • I70 view 1 with logo.png
      • TT Mtg 1 Minutes October 7, 2022.pdf
      • Documents
        • Aesthetics
          • Areas of Special Attention
          • Aesthetics Photo Boards
          • Aesthetics Context Maps
          • Aesthetics Design Segment Guidance
          • Aesthetic Guidance Diagram
          • Tunnel Visioning - A Design Workshop for the Twin Tunnels
          • Tunnel Visioning 2013 A Design Workshop for the Twin Tunnels
          • Engineering Design Criteria and Illustration
        • Core Values
        • CSS
        • Decision Making
        • Historic Context
        • Templates
        • Plans, Agreements, and Legal Requirements
        • Stakeholder Input
        • PDFs
Aesthetics https://www.codot.gov/projects/i70mountaincss/assets/docs/aesthetics https://www.codot.gov/@@site-logo/siteLogo.png

Aesthetics

Areas of Special Attention
Aesthetics Photo Boards
Aesthetics Context Maps
Aesthetics Design Segment Guidance
Aesthetic Guidance Diagram
Tunnel Visioning - A Design Workshop for the Twin Tunnels
Tunnel Visioning 2013 A Design Workshop for the Twin Tunnels
Engineering Design Criteria and Illustration

Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo