Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Mountain Corridor Context Sensitive Solutions
  4. Assets
  5. Documents
  6. PDFs
  7. SWEEP
Resources
  • Projects
  • Assets
  • Studies
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Glenwood Canyon Material Flows
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • I-70 East of DeBeque Resurfacing
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • ADA Ramp Project on US 6 & South Frontage Road in Eagle and Vail
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 67 Safety Improvements in Douglas & Teller Counties
  • US 85 at WCR 66 Acceleration Lanes in North Greeley
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 92 Chip Seal Project in Montrose and Delta County
  • US 50 Cañon City Road Maintenance
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • I-70 Mountain Corridor Context Sensitive Solutions
    • Context Statement
    • Core Values
    • Decision Making
    • Design
    • CSS on the I-70 Corridor
    • Glossary
    • What's New on the I-70 Mtn Corridor
    • Context Sensitive Solutions (CSS) Overview
    • Context Sensitive Solution Team Roles and Responsibility.pdf
    • I70 view 1 with logo.png
    • Assets
      • sprite decision
      • home widget map
      • homepage video
      • homepage lifecycle
      • homepage decision
      • banner design4
      • banner design3
      • banner design2
      • banner design1
      • Homepage 4
      • Homepage 3
      • Homepage 2
      • Homepage 1
      • Homepage
      • Life Cycle Phases
      • 6 step process
      • Photo Library
      • Context Sensitive Solution Process_Visual Information.JPG
      • Slide2.PNG
      • Context Sensitive Solution Team Roles and Responsibility.pdf
      • I70 view 1 with logo.png
      • TT Mtg 1 Minutes October 7, 2022.pdf
      • Documents
        • Aesthetics
        • Core Values
        • CSS
        • Decision Making
        • Historic Context
        • Templates
        • Plans, Agreements, and Legal Requirements
        • Stakeholder Input
        • PDFs
          • Corridor Team Meetings
          • ALIVE
          • SWEEP
            • SWEEP May 21 2008Agenda
            • SWEEP May 21 2008 Meeting Minutes
            • SWEEP May 21 2008 Meeting Attendees
            • SWEEP July 17 2008 Meeting Minutes Final
            • SWEEP October 27 2008 Meeting Minutes
            • July 17 2008 SWEEP Agenda
            • 20090724 Mtg SWEEP Mtg 4
            • Black Gore Sediment Control Action Plan May 2002
            • PEIS Section 3 19 Mitigation Summary Table
          • Sustainability Working Group
          • Process Working Group
          • Water Related Issues
          • Base Sheets
          • Chain Stations
          • Open House Materials
          • CE
          • PLT
          • Boyd Michael ASPOUSA2008
          • ATA Sustainability
          • apta public transportation fuel savings final 010807
          • Appendices to the I 70 Mountain Corridor Programmatic Agreement for Cultural Resources 1
          • Alt. Algae Fuel
          • AGSMapPlanProfilePreferredAlternative
          • 110331 Western Slope Canyons and Valleys
          • 110331 Crest of the Rockies
          • DRCOG Measuring Progress Regional Performance Measures Indicators
          • DOT HUD EPA PartnershipAgreement
          • Diesel Emissions
          • DCP Energ Transitio Transportation May 22 2008
          • Davidson Bryn Scenario Planning ASPOUSA2008
          • CollaborationandCommunication IssueDiagnosticTool
          • CNAS King Peak Oil WorkingPaper
          • Colorado DOT Presentation 02032012
          • CriticalIssuesMatrix1209
          • Clean Communities
          • County Working Groups Invite
          • CDOTLifeCyclePhases
          • CollaborationandCommunication TeamRolesbyLifeCycle
          • Colorado Motor Carriers Association CMCA
          • CDOTPlanningLinkagesChart
          • CorridorGuidance PotentialPermit Requirements
          • ColoradoDOT FEElanes
          • Combined Historic Context Report
          • Idaho Springs Visioning PARTICIPANT LIST
          • I 70 Mountain Corridor Programmatic Agreement for Cultural Resources
          • I 70 Mnt Corr M O Report FINAL web
          • I 70 Early Enhancement Opportunities
          • I 70 Guidelines for Enhancing Wildlife Permeability
          • EPA Smartway
          • I70 Functional Context Map
          • Heading for the Exit Lane June 26 2008
          • I 70 Eco Logical Project Final Report Sept2011
          • Gilbert Jeremy ASPOUSA2008
          • I 70 Connectivity Recommendations
          • I 70 Eco Logical Database Instructions
          • Executed I 70 PA
          • I 70 Monitoring and I 70 Wildlife Watch Report
          • I 70 Connectivity Recommendations Matrix
          • I 70 Collaborative Effort Meeting Schedule
          • Online TDM Encyclopedia Sustainable Transportation and TDM 2
          • Online TDM Encyclopedia Sustainable Transportation and TDM
          • Monitoring References
          • LIZ Updates September 2008
          • LIZ Progression Table
          • LIZ Progression Chart from PEIS
          • LifeCyclePhases TasksbyLifeCyclePhase
          • Wildlife Crossing Design References
          • Weissman Andy ASPOUSA2008
          • Verosub Ken Petro 101 ASPOUSA2008
          • Udall Randy PeakOilGlobalWarming ASPOUSA2008
          • Sperling Dan ASPOUSA2008
          • Simmons Matthew ASPOUSA2008
          • RICS June2007
          • Rapier Robert ASPOUSA2008
          • Puplava Jim Macro Investment ASPOUSA2008
          • Peak Oil Review June 9 2008
          • Mtn MinBelt Aesthetics Working Group
          • I 70 Aesthetic Working Group Process
          • I 70 Aesthetic Design Principles
          • Front Range Foothills Aesthetics Working Group Sign In
          • Crest of Rockies Aesthetics Working Group
          • August 20 2009 Asethetics Working Group Presentation
          • Aesthetics Wkg Grp May 29 2009 PresB
          • Aesthetics Wkg Grp May 29 2009 PresA
          • Aesthetics Wkg Grp May 29 2009 Pres
          • Western Slope Canyons Aesthetics Working Group
          • CDOT Bike Ped Policy
          • Sustainable Transportation Indicators
          • Sustain Trans Indicators Nov 08
          • July 14 2008 Historic Context Working Group Agenda
          • HIstoric Context July 14 2008 Meeting Minutes
          • Historic Context WG Directory
          • Historic Context Schedule
          • TT
SWEEP https://www.codot.gov/projects/i70mountaincss/assets/docs/pdfs/sweep https://www.codot.gov/@@site-logo/siteLogo.png

SWEEP

SWEEP May 21 2008Agenda
SWEEP May 21 2008 Meeting Minutes
SWEEP May 21 2008 Meeting Attendees
SWEEP July 17 2008 Meeting Minutes Final
SWEEP October 27 2008 Meeting Minutes
July 17 2008 SWEEP Agenda
20090724 Mtg SWEEP Mtg 4
Black Gore Sediment Control Action Plan May 2002
PEIS Section 3 19 Mitigation Summary Table

Sign Up for Travel Alerts & Project News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo