Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Idaho Springs Clear Creek Greenway Path Project
  4. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Repaving and Structural Repairs in Walsenburg
  • CO 93 Resurfacing between US 6 and 58th Ave
  • CO 64 & CO 13 Meeker Resurfacing
  • Idaho Springs Clear Creek Greenway Path Project
    • Photo Gallery
      • Worker on Clear Creek Greenway Project.jpg
      • Work operation on the project.jpg
      • Workers on path 12.8.png
      • Construction on Clear Creek Greenway PNG 12.8.png
      • Clear Creek Greenway path 12.8.jpg
      • 314 Wall on project site PNG.png
      • 314 Excavators PNG.png
      • Clear Creek Greenway road work 2.8.22.jpg
      • Clear Creek Greenway road work.jpg
      • March Progress Photo (1).jpg
      • March Progress Photo (2).jpg
      • Greenway trail .jpg
Photo Gallery https://www.codot.gov/projects/idaho-springs-clear-creek-greenway-path/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Worker on Clear Creek Greenway Project.jpg thumbnail image Worker on Clear Creek Greenway Project.jpg
Work operation on the project.jpg thumbnail image Work operation on the project.jpg
Workers on path 12.8.png thumbnail image Workers on path 12.8.png
Construction on Clear Creek Greenway PNG 12.8.png thumbnail image Construction on Clear Creek Greenway PNG 12.8.png
Clear Creek Greenway path 12.8.jpg thumbnail image Clear Creek Greenway path 12.8.jpg
314 Wall on project site PNG.png thumbnail image 314 Wall on project site PNG.png
314 Excavators PNG.png thumbnail image 314 Excavators PNG.png
Clear Creek Greenway road work 2.8.22.jpg thumbnail image Clear Creek Greenway road work 2.8.22.jpg
Clear Creek Greenway road work.jpg thumbnail image Clear Creek Greenway road work.jpg
March Progress Photo (1).jpg thumbnail image March Progress Photo (1).jpg
March Progress Photo (2).jpg thumbnail image March Progress Photo (2).jpg
Greenway trail .jpg thumbnail image Greenway trail .jpg

Contact Us

Project Hotline:  
720-664-4671

Project Email:
[email protected]com

Project News and Updates
  • Clear Creek Greenway Project Announcement Aug 25, 2021
Project News and Updates - More…
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo