Active Construction, US construction
Northeastern Colorado Studies
Active Construction, Interstates
Active Construction, US Highways
Keywords: Active Studies, US Highways
Keywords: US Highways
September 2004 - Environmental Assessment (EA) - The Federal Highway Administration (FHWA) in conjunction with the Colorado Department of Transportation (CDOT) has been conducting studies to investigate alternatives that would improve mobility (travel conditions) and safety on the stretch of approximately 2 miles of US 287 between SH 1 and the LaPorte Bypass intersection east of the town of LaPorte, mileposts (MP) 348.50 and 350.35. June 2006 - Finding of No Significant Impact (FONSI) - This document contains a FONSI and selects Preferred Alternative A4 with Reduced Footprint based on the analyses and results in the attached EA. Keywords: Studies, US Highways, Study, Studies
US Highways, US 287 Intersection Improvements at Foothills Pkwy
Active Construction, US Highways
January 2007 - The Colorado Department of Transportation (CDOT) developed and initiated the Environmental Overview Study (EOS) process. The EOS process is structured to provide a basis for long-term roadway improvements and to provide support for local planning decisions while considering environmental resources decisions. While no funds are currently programmed for construction, the intended outcome of the process is the preservation of a corridor for future transportation improvements. Through this process, future improvements to the Colorado highway system can be integrated with other local and regional transportation plans resulting in a proactive, environmentally sensitive transportation vision within the North Front Range. Keywords: Studies, US Highways, Study, Studies
Active Study, US Highways
US Highways