Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
  5. Chapter 4 Environmental Consequences
Resources
  • Projects
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
      • Cover
      • Signature-Abstract
      • Table Of Contents
      • Executive Summary
      • Chapter 1 Purpose and Need
      • Chapter 2 Alternatives
      • Chapter 3 Transportation Analysis
      • Chapter 4 Environmental Consequences
        • Environmental Consequences
        • Section 1 Socio-Economics and Community
        • Section 2 Right-of-Way and Displacements
        • Section 3 Parks and Recreation
        • Section 4 Aesthetics and Urban Design
        • Section 5 Air Quality
        • Section 6 Noise and Vibration
        • Section 7 Historic Preservation
        • Section 8 Paleontology
        • Section 9 Water Resources
        • Section 10 Floodplains
        • Section 11 Wetlands, Waters Of The US, & Open Water
        • Section 12 Vegetation and Wildlife
        • Section 13 Hazardous Waste
        • Section 14 Soils and Geology
        • Section 15 Energy
        • Section 16 Short-Term Uses and Long-Term Productivity
        • Section 17 Irreversible and Irretrievable Commitments of Resources
        • Section 18 Construction Impacts
        • Section 19 Permits
        • Section 20 Cumulative Impacts
        • Section 21 Sum Of Impacts, Mitigation Measures, & Monitoring Commitments
      • Chapter 5 Section 4(f) Evaluation
      • Chapter 6 Public Involvement
      • Chapter 7 Phased Project Implementation
      • Chapter 8 List Of Preparers
      • Chapter 9 Availability Of Technical Reports
      • Chapter 10 References
      • Chapter 11 Index
      • June 2007 Record Of Decision
      • App C CDOT Mitigation Tracking Form
      • App A Form 1399 Reevaluation
      • Appendices
      • US 6 Record of Decision (ROD) 2 Final Feb 2013
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
Chapter 4 Environmental Consequences https://www.codot.gov/projects/studies/i-25-valley-highway-EIS/newchapter_4 https://www.codot.gov/@@site-logo/siteLogo.png

Chapter 4 Environmental Consequences

Environmental Consequences
Section 1 Socio-Economics and Community
Section 2 Right-of-Way and Displacements
Section 3 Parks and Recreation
Section 4 Aesthetics and Urban Design
Section 5 Air Quality
Section 6 Noise and Vibration
Section 7 Historic Preservation
Section 8 Paleontology
Section 9 Water Resources
Section 10 Floodplains
Section 11 Wetlands, Waters Of The US, & Open Water
Section 12 Vegetation and Wildlife
Section 13 Hazardous Waste
Section 14 Soils and Geology
Section 15 Energy
Section 16 Short-Term Uses and Long-Term Productivity
Section 17 Irreversible and Irretrievable Commitments of Resources
Section 18 Construction Impacts
Section 19 Permits
  • 1
  • 2
  • Next 2 items

Tags:
  • Project: I-25 Valley Highway
  • I25 Valley Highway EIS
  • Denver Metro Area (Region 6)
  • Library
Contact

CDOT Project Manager:

Tony Gross
CDOT Region 6
2000 S. Holly St.
Denver, CO 80222
[email protected]

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo