Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Southwest Colorado Flood Recovery
  4. Assets
Assets https://www.codot.gov/projects/swcofloodrepairs/assets https://www.codot.gov/@@site-logo/siteLogo.png

Assets

Southwest Colorado Flood Recovery Project Locations Map.png
Southwest Colorado Flood Recovery Reconstruction repairs happening at CO 151.jpg
Southwest Colorado Flood Recovery CDOT Engineer points out work that has begun at the site of the US 160 collapsed Piedra River Bridge..jpg
Southwest Colorado Flood Recovery - Paving operations on US 160 Wolf Creek Pass near South Fork as CDOT prepares to open the highway before Thanksgiving..jpg
Southwest Colorado Flood Recovery - This week, crews began demolition of the damaged Piedra River Bridge on US 160 between Durango and Pagosa Springs..jpg
SWCO Flood Repairs US 160 Wolf Creek Pass side arial view of repairs.png
SWCO Flood Repairs US 160 and CO 151 map.png
SWCO Flood Repairs CO 151 paving operations.jpg
SWCO Flood Recovery CO 151 opens map.png
SWCO Flood Recovery CO 151 washed away after flooding.jpg
SWCO Flood Recovery CO 151 washed away after flooding.jpg

Contact Us

Project Hotline:  
970-765-0609

Project Email:
[email protected]

Stay Informed

Sign up for project updates by clicking the link below:

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo