US 287 and CO 14 Flood Repairs

Project Facts

  • Cost: $934,000
  • Contractor: Duran Excavating
  • Timeline: March - July 2019
  • Locations:
    1. CO 14 from mile point (MP) 104.83 to MP 106.26
    2. CO 14 from MP 114.04 to MP 106.26; and
    3. US 287 at MP 355.10
US 287 CO 14 Site 1.JPG

Site 1

US 287 CO 14 Site 2.JPG

Site 2

Crews on this project will place erosion-control materials along highway embankments at various locations on US 287 and CO 14, temporarily divert river channel flow, and reconstruct and install cross culverts.  


Traffic Impacts


Crews started this project in March 2019, and expect to complete work in July 2019.

  • Work hours: 7 a.m. to 5 p.m., Monday through Friday
  • Expect traffic restrictions, including:
    • reduced speed limits
    • shoulder and lane closures
    • flaggers on site
    • delays