US 40 Rabbit Ears Pass Repairs & Resurfacing

Project Facts

  • Cost: $6.4 million
  • Contractor(s): United Companies
  • Timeline: April 30 through October 2018
  • Location: On US 40 starting at Walton Creek Road (mile point 135.3) and ending at the Rabbit Ears pass summit (mile point 147.5), with additional work at mile point 151.92

From late April through October 2018, crews repaired and resurfaced more than 12 miles of US 40, from the east end of Steamboat Springs to the summit of Rabbit Ears Pass, in Routt County.

Other work included replacing a drainage culvert east of the summit (at mile point 151.92).