Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. US 160 Wolf Creek Pass Fiber & Safety Systems
  4. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • I-70 East of DeBeque Resurfacing
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • ADA Ramp Project on US 6 & South Frontage Road in Eagle and Vail
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 67 Safety Improvements in Douglas & Teller Counties
  • US 85 at WCR 66 Acceleration Lanes in North Greeley
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 92 Chip Seal Project in Montrose and Delta County
  • US 50 Cañon City Road Maintenance
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • CO 121 Signal Improvements in Jefferson County
  • US 160 Wolf Creek Pass Fiber & Safety Systems
    • Photo Gallery
      • Rock Saw.JPG
      • Placing Flow-fill in trench_76.JPG
      • Placing Flow-fill in trench.JPG
      • Rock Saw.jpg: Rock saw equipment to create the trench for the new conduit.
      • Conduit Ready to go into trenchl
      • Conduit Ready to go into trench.JPG
      • Excavation activities begin. Photo provided by Paonia Inc.
      • Excavation setup. Photo provided by Paonia Inc.
      • Crews await supplies to start fiber installation. Photo provided by Paonia Inc.
      • Snow still on the pass in late May. Photo provided by Paonia Inc.
      • Crews on US 160 complete the fiber optic line installation with new asphalt. (photo by SEH)
      • Crews and excavator digging a trench for the new fiber optic line on US 160. (photo by SEH)
      • Crews on US 160 work to thread the fiber optic line through the junction box. (photo by SEH)
      • Photo showing the new fiber optic line in the trench along US 160. (photo by SEH)
Photo Gallery https://www.codot.gov/projects/us160-wolfcreekpass-fiber/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Rock Saw.JPG thumbnail image Rock Saw.JPG
Placing Flow-fill in trench_76.JPG thumbnail image Placing Flow-fill in trench_76.JPG
Placing Flow-fill in trench.JPG thumbnail image Placing Flow-fill in trench.JPG
Courtesy of SEH thumbnail image Rock Saw.jpg: Rock saw equipment to create the trench for the new conduit.
Courtesy of SEH. thumbnail image Conduit Ready to go into trenchl
Conduit in trench.jpg: Conduit being installed in the trench along US 160. courtesy of SEH. thumbnail image Conduit Ready to go into trench.JPG
Excavation activities begin. Photo provided by Paonia Inc. thumbnail image Excavation activities begin. Photo provided by Paonia Inc.
Excavation setup. Photo provided by Paonia Inc. thumbnail image Excavation setup. Photo provided by Paonia Inc.
Crews await supplies to start fiber installation. Photo provided by Paonia Inc. thumbnail image Crews await supplies to start fiber installation. Photo provided by Paonia Inc.
Snow still on the pass in late May. Photo provided by Paonia Inc. thumbnail image Snow still on the pass in late May. Photo provided by Paonia Inc.
Crews on US 160 complete the fiber optic line installation with new asphalt. (photo by SEH) thumbnail image Crews on US 160 complete the fiber optic line installation with new asphalt. (photo by SEH)
Crews and excavator digging a trench for the new fiber optic line on US 160. (photo by SEH) thumbnail image Crews and excavator digging a trench for the new fiber optic line on US 160. (photo by SEH)
Crews on US 160 work to thread the fiber optic line through the junction box. (photo by SEH) thumbnail image Crews on US 160 work to thread the fiber optic line through the junction box. (photo by SEH)
Photo showing the new fiber optic line in the trench along US 160. (photo by SEH) thumbnail image Photo showing the new fiber optic line in the trench along US 160. (photo by SEH)

Contact Us

Project Hotline:  
970-363-5100

Project Email:
[email protected]

Photo Gallery

US 160 Wolf Creek PAss Fiber/Safety Project Photos

Project News and Updates
  • Next phase is beginning for US 160 Wolf Creek Pass fiber optic project Apr 17, 2023
  • CDOT to install fiber optic on US Highway 160, Pagosa Springs to Wolf Creek Pass Apr 18, 2022
Project News and Updates - More…
Sign Up for Travel Alerts & Project News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo