US 24 Resurfacing from Burlington to Bethune

About the Project

This is a resurfacing project on US 24 from the intersection of Rose Avenue and Lincoln Street in Burlington (MP 454.8) to west of Bethune (MP 443 or 444, depending on funding).

The project includes:

  • Milling the existing wide pavement section, intersecting streets and driveways
  • Milling some shoulders at the following locations:
    • West of Burlington
    • County Road 40 intersection in Bethune
    • The Landsman Creek bridge
  • Two-inch hot mix asphalt overlay

Work this Week & Lane Closures for US 24 Resurfacing from Burlington to Bethune

Project Facts

  • Construction Cost: To be announced
  • Contractor: Simon Contractors
  • Timeline: September 2025 to November 2025
  • Location: US 24 
    • Nearest Town/City: Bethune and Burlington
    • Mile Point(s): MP 454.8 to MP 443
    • County: Kit Carson
Map of the US 24 resurfacing project location from Burlington (MP 454.8) to Bethune (MP 443-444)
Map of the US 24 resurfacing project location from Burlington (MP 454.8) to Bethune (MP 443 or 444)

Project Benefits

  • Resurfacing can greatly extend the life of the asphalt pavement
    • Some highways may last more than 50 years with periodic resurfacing of the top layer of asphalt and timely repairs
  • A smooth highway improves safety and quality of the driving experience

Work Schedule

  • The project is anticipated to begin Sept. 29, 2025
  • Work is expected to be complete in early to mid November
  • Normal working hours will be from approximately 7 a.m. to 6 p.m.

Traffic Impacts

Motorists can expect the following impacts during the period of construction:

  • There will be one-lane alternating traffic during work hours throughout the course of the project
  • Delays up to 10 minutes can be expected
  • The speed limit will be reduced to 40 MPH through the work zone
  • Loads wider than 10 feet will be restricted through the work zone
  • Refer to COtrip.org for real-time travel conditions and road closures