CDOT has identified a need for improvements at the US 34 & Weld County Road 17 intersection to address traffic congestion and safety concerns.

The US 34 Planning and Environmental Linkages Study identified the need for an interchange at US 34 and CR 17 to meet future traffic demands. CDOT began evaluating interchange alternatives in 2020 with the goal of selecting a preferred alternative to carry into design.

The US 34 & Weld County Road 17 interchange design project will include a grade separated crossing of Weld CR 17 with US 34 being carried over the top of CR 17. The preferred interchange alternative will be selected in the spring of 2021 and 30% design is expected to be completed by the fall of 2021. Construction funding has not been identified at this time.

Project Schedule

Interchange Design Selection: Spring 2021