US 6 Avon to Dowd Junction Resurfacing

Project Facts

  • Cost: $5.9 Million
  • Contractor: United Companies
  • Timeline: April - October 2021
  • Location: US 6 from Avon to Dowd Junction, from MP 33.13 to 174.50.

US 6 Dowd Map

Click image to enlarge.

Project Complete!

The Colorado Department of Transportation will begin resurfacing improvements on US Highway 6 from Avon to Dowd Junction on April 26. Most work will take place on US  6 between Mile Point 170 and MP 175, with primary work consisting of milling the existing asphalt surface and repaving. Two Interstate 70 ramps will also be repaved, including the I-70 eastbound on-ramp at Exit 169 and the westbound off-ramp of Exit 171. Work will also include replacement of guardrail, striping, adding a bike lane between MP 172 and MP 173, ADA ramp upgrades, erosion control, and traffic control management. United Companies has been selected for this project, which is expected to be completed in Fall 2021. No full stops on I-70 or US 6 are expected.


Work Schedule

Travelers will encounter resurfacing operations Monday through Friday, from 7 a.m. to 7 p.m.


Traffic Impacts

Travelers will encounter resurfacing operations Monday through Friday, from 7 a.m. to 7 p.m. Speeds will be reduced to 35 mph in work zones. Traffic control and temporary signals will be operating 24/7 with one lane closures at project work zones. Wide load restrictions of 12 ft.