Wadsworth Boulevard Resurfacing from 65th to 90th Avenue Design
About the Study
The Colorado Department of Transportation (CDOT) is proposing to resurface Wadsworth Boulevard from West 65th to West 90th Avenues. The project is on CDOT’s 5-Year Plan and is currently in the early design phase and evaluating environmental impacts.
Other improvements include:
- Upgrading curb ramps to Americans with Disabilities Act (ADA) standards
- Traffic signal replacement at the intersection of West 68th Avenue and Wadsworth Boulevard
The improvements at the Wadsworth Boulevard and West 68th Avenue intersection will require that easements and a partial right-of-way parcel be acquired from the Arvada Center for Arts and Humanities Sculpture Field property for construction and future maintenance of the signal equipment. Impact areas total approximately 430 square feet at the corner adjacent to sidewalk and roadway. Access to the property would not be affected during construction and all disturbance areas would be restored.
The Arvada Center for Arts and Humanities Sculpture Field is a significant recreation property. The project was awarded federal transportation funding and therefore Section 4(f) of the U.S. Department of Transportation (USDOT) Act applies which protects publicly owned parks, recreation properties, wildlife and waterfowl refuges, and public or private historic sites. The public is afforded an opportunity to comment on these impacts, which are determined to not adversely affect the activities, features and attributes that qualify the property for Section 4(f) protection (“de minimis use”).
Schedule & Important Dates
- Design/Study Start Date: Sept. 1, 2026
- Public Meeting Date: To be determined
- Design/Study End Date: To be determined
Project Area
- Resurface Wadsworth Boulevard from 65th Avenue to 90th Avenue via mill and fill
- Enhance ADA compliance by rebuilding sidewalks and upgrading curb ramps between 65th and 90th Avenues
- Improve public transit access at the southwest corner of 90th Avenue and Wadsworth Boulevard
- Upgrade safety infrastructure by modernizing four traffic signals and installing a guardrail at 77th Drive/Vance Drive
- Optimize corridor access by permanently closing the driveway on the southwest corner of the intersection
The project will provide the following benefits:
- Improve the surface of the roadway
- Improve safety and connectivity for non-motorist users
- Upgrade aging traffic signals