Weld County Americans with Disabilities Act Curb Ramps

About the Project

Americans with Disabilities Act (ADA) curb ramp work will take place in multiple locations, including:

  • CO 60
  • 28th Street
  • US 34
  • 8th Avenue
  • 2nd Avenue

The ADA requires state and local governments to make pedestrian crossings accessible to people with disabilities. It is often difficult or impossible for a person using a wheelchair, scooter, walker or other mobility device to cross a street if the sidewalk is without curb ramps.

The project work will be completed starting in Milliken, heading north to Greeley.

Work this Week & Lane Closures for Weld County ADA Curb Ramps

Project Facts

  • Construction Cost: $739,500
  • Contractor: Rodriguez Construction
  • Timeline: May 2026 to September 2026
  • Location: US 34, CO 60 
    • Nearest Towns/Cities: Milliken to Greeley
    • Mile Point(s): To be listed
    • County: Weld

Project Benefits

This project will ensure that curb ramps:

  • Meet all current standards and requirements
  • Provide pedestrian safety
  • Enhance accessibility on ramps and in crosswalks

Work Schedule

To be announced.


Traffic Impacts

  • To be announced
  • Refer to COtrip.org for real-time travel conditions and road closures