Weld County Americans with Disabilities Act Curb Ramps
About the Project
Americans with Disabilities Act (ADA) curb ramp work will take place in multiple locations, including:
- CO 60
- 28th Street
- US 34
- 8th Avenue
- 2nd Avenue
The ADA requires state and local governments to make pedestrian crossings accessible to people with disabilities. It is often difficult or impossible for a person using a wheelchair, scooter, walker or other mobility device to cross a street if the sidewalk is without curb ramps.
The project work will be completed starting in Milliken, heading north to Greeley.
Work this Week & Lane Closures for Weld County ADA Curb Ramps
Project Facts
- Construction Cost: $739,500
- Contractor: Rodriguez Construction
- Timeline: May 2026 to September 2026
- Location: US 34, CO 60
- Nearest Towns/Cities: Milliken to Greeley
- Mile Point(s): To be listed
- County: Weld
Project Benefits
This project will ensure that curb ramps:
- Meet all current standards and requirements
- Provide pedestrian safety
- Enhance accessibility on ramps and in crosswalks
Work Schedule
To be announced.
Traffic Impacts
- To be announced
- Refer to COtrip.org for real-time travel conditions and road closures
