Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Home
You are here:
  1. Home
Item type
New items since

Search results

RSS Subscribe to an always-updated RSS feed.

117 items matching your search terms.
Sort by relevance date (newest first) alphabetically
  1. Extended closure of the County Line Road interchange near Monument for bridge work

    June 21, 2021 - Central/Eastern Colorado - Detour using CO 105 interchange; sign up for text alerts by texting I25GAP to 21000

    Located in News / 2021 / June 2021
  2. I-25 and ramp closures for bridge construction evening of Sept. 1

    September 1, 2021 - Central/Eastern Colorado/Southeastern Colorado

    Located in News / 2021 / September 2021
  3. C-470/US 85 (Santa Fe Drive) Interchange Located in Projects / Archived Project Sites / ARRA Project Files
  4. C-470/US 85 (Santa Fe Drive) Interchange

    Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.

    Located in Projects / Archived Project Sites / ARRA Project Files
  5. Overview Located in Projects / Archived Project Sites / ARRA Project Files
  6. US 85 between Titan Road and Cook Ranch

    Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in ...

    Located in Projects / Archived Project Sites / ARRA Project Files
  7. C-470 between I-25 and Santa Fe Drive Located in Projects / Archived Project Sites / ARRA Project Files
  8. C-470 between I-25 to Santa Fe Drive

    Repairs or replaces concrete slabs on C-470 and resurfaces C-470 in asphalt. Rehabilitates the C-470 bike path between I-70 and I-25.

    Located in Projects / Archived Project Sites / ARRA Project Files
  9. I-25, US 36 and C-470 Located in Projects / Archived Project Sites / ARRA Project Files
  10. I-25, US 36 and C-470

    Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. ...

    Located in Projects / Archived Project Sites / ARRA Project Files
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 12
  • Next 10 items
Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo