-
Extended closure of the County Line Road interchange near Monument for bridge work
June 21, 2021 - Central/Eastern Colorado - Detour using CO 105 interchange; sign up for text alerts by texting I25GAP to 21000
Located in
News
/
2021
/
June 2021
-
I-25 and ramp closures for bridge construction evening of Sept. 1
September 1, 2021 - Central/Eastern Colorado/Southeastern Colorado
Located in
News
/
2021
/
September 2021
-
C-470/US 85 (Santa Fe Drive) Interchange
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
C-470/US 85 (Santa Fe Drive) Interchange
Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
Overview
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
US 85 between Titan Road and Cook Ranch
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in ...
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
C-470 between I-25 and Santa Fe Drive
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
C-470 between I-25 to Santa Fe Drive
Repairs or replaces concrete slabs on C-470 and resurfaces C-470 in asphalt. Rehabilitates the C-470 bike path between I-70 and I-25.
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
I-25, US 36 and C-470
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files
-
I-25, US 36 and C-470
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. ...
Located in
Projects
/
Archived Project Sites
/
ARRA Project Files