-
I-25 Cable Barrier Phase IV
Interstates, I-25 Southbound from MP 122 at Pikes Peak International Speedway to MP 113 five miles south of Wigwam Project description The project goal is ...
Located in
Projects
/
Archived Project Sites
-
US 50 SHIFT Passing Lanes | Study Phase
Located in
Projects
/
Studies
-
US 50B & US 50C Corridor Safety | Study Phase
U.S. Highways
Located in
Projects
-
US 50 Lane Closures for Fiber Line Installation
January 23, 2019 - Southeastern Colorado
Located in
News
/
2020
/
January 2020
-
23rd Ln. Storm Sewer (US 50C to Everett Rd.)
US Highways
Located in
Projects
/
Archived Project Sites
-
CDOT repairing concrete on Pueblo Blvd, southbound lane closure
November 8, 2019 - Southeastern Colorado
Located in
News
/
2019
/
November
-
I-25 Ilex project final work will require daily lane and ramp closures
October 18, 2019 - Southeastern Colorado
Located in
News
/
2019
/
October
-
I-25 Ilex project bridge work will require temporary lane reconfigurations, lane and ramp closures
September 25, 2019 - Southeastern Colorado
Located in
News
/
2019
/
September
-
I-25 Ilex project bridge work will require temporary lane reconfigurations, lane and ramp closures
September 13, 2019 - Southeastern Colorado
Located in
News
/
2019
/
September
-
Work resumes on US50 Realignment Purcell Boulevard to the BNSF Railroad Crossing project
August 16, 2019 - Southeastern Colorado
Located in
News
/
2019
/
August