-
Preferred alternative selected for Mt. Garfield Culvert Study
May 20, 2021 - Northwestern Colorado - CDOT to begin design this summer
Located in
News
/
2021
/
May 2021
-
Region 3 Intersection Priority
This files includes the Final Region 3 Intersection Priority Study. All of the supporting indexes are NOT included with this file and can be requested to be ...
Located in
Projects
/
Studies
-
SH 42 Planning and Environmental Linkage Study (PEL)
The 42 Gateway Project is an infrastructure improvement study that seeks to influence the form, function, character, and accessibility of the Highway 42 ...
Located in
Projects
/
Studies
-
SH 79 and Kiowa-Bennett Corridor Study Alternatives Available for Review
May 6, 2013 - Central Eastern Colorado/CDOT Region 1 - Bennett, CO – The Town of Bennett has partnered with Adams and Arapahoe Counties and the Colorado ...
Located in
News
/
2013 News Releases
/
05-2013
-
SH 83/86 Corridor Optimization Plan
September 2004 - The Corridor Optimization process was created to develop specific corridor visions which are consistent and compatible with local plans and ...
Located in
Projects
/
Studies
-
SH 133 Carbondale Access Control Plan
The SH 133 Carbondale Access Control Plan will assess the existing and proposed access points along SH 133 within the study area and make recommendations for ...
Located in
Projects
/
Studies
-
SH 402 EA and FONSI
Environmental Assessment (EA) - July 2007 and Finding of No Significant Impact (FONSI) - January 2008- encompasses the 4-mile length of SH 402 although ...
Located in
Projects
/
Studies
-
Studies & Assessments
Located in
Projects
/
Studies
-
US 6 Clifton Transportation Study
Located in
Projects
/
Studies
/
Completed Studies
-
US 6 Clifton Transportation Study
The US 6 Clifton Transportation Study is a Planning and Environmental Linkages (PEL) study that will analyze transportation issues and explore a range of ...
Located in
Projects
/
Studies
/
Completed Studies