Business Center

Scheduled Bid Openings

Design-Bid-Build Construction Project Advertisements

*Five new projects advertised  October 25, 2018 & November 1, 2018

CDOT posts new advertisements on a bi-weekly schedule. Our next advertisement date is October 24, 2018.
Electronic plans and specifications are available to registered contractors at B2G. Please be sure to do an account lookup if you are new to the system as many vendors have been entered by CDOT into the system. This will allow you to reset the password if the proper contacts were entered. Upon registration, you can find the plans and specifications or the plan holders list for each project under the "View" menu by selecting "My Bid Solicitations". 
Prime contractors are directed to our Rules Governing Construction Bidding for CDOT Projects which details the requirements of Prequalification in Section 2
All Design-Bid-Build proposals are processed electronically via Bid Express.  Primes must obtain a Digital ID for an agent identified in your prequalification registration. 
EBSx software is available here: AASHTOWare Project Bids (https://bids.cloverleaf.net/) and please remember to hit enter after creating your profile.  For any technical difficulties with Project Bids or the Bid Express website, contact customer service at 888-352-2439 or at [email protected]
Thank you for your interest in our construction projects.  We look forward to working with you.

October 25

FSA 0142-063 (19664) ~ This project consists of concrete pavement reconstruction on West Main street and Division Ave. New concrete pavement construction through out the new S-Curve and curb and gutter sidewalk construction curb ramps reconstruction and medians with median lighting, storm sewer installation and stripping and signing.  This project is located in Logan county near Sterling. 

A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON MONDAY, OCTOBER 22, 2018 BEGINNING AT 10:00 AM IN THE CDOT REGION 4 STERLING RESIDENCY LOCATED AT 120 NORTH RIVERVIEW ROAD, STERLING, CO 80751

25Oct001.EBSx

Revision 1

FSA 052A-047 (21856) ~ This project is an intersection widening project. Salient features include new signals and caissons, street lighting, both overlay and full depth HMA, curb and gutter, raised median, and concrete drainage pipe. Located it Weld county. 

DEFERRED TO NOVEMBER 1, 2018

NHPP 0401-023 (21290) ~ This project is located within Moffat County, along US 40, with project limits beginning at MP 31 and continuing East to MP 37. The project's scope includes surface treatment (1.5" overlay), guardrail replacement, pavement marking, and traffic control.

25Oct003.EBSx

Revision 1

Q&A

November 1

*NH 2854-139 (20949) ~ US 285, 2.5" Mill and fill from M.P. 171.3 to 174.98, Passing lanes and turn lanes widening from M.P. 174.98 to 178.02 this includes extending 16 existing culvert pipes, 2.5" Mill and fill from M.P. 178.02 to 182.76, 2.5" Mill and fill from M.P. 183.39 to 185.4. 4" Mill and fill from M.P. 185.4 to M.P. 186.1. 2.5" Mill and fill from M.P. 186.1 to M.P. 190.0. This project is located in Park county.

01Nov001.EBSx

*NHPP 0702-366 (21245) ~ This project is located on I-70 from MP 166.0 to 174.5, with work and mainline resurfacing between MP 167 and 173.52 in Eagle County.  The construction will consist of a 2" mill and HMA overlay, guardrail work, rumble strips, striping, bridge rail, bridge joint repair, erosion control, and traffic control management.

01Nov002.EBSx

*ER 0361-118 (20744) ~ This project consists of Re-wetting of Munggins gulch on US 36 from MM 7 to MM 8 in Larimer county.  It will include a concrete box culvert, a tunnel, specialized river and environmental considerations, rock blasting to facilitate a rockfall ditch, paving and rockfall mitigation. 

DEFERRED UNTIL NOVEMBER 8, 2018

*STA 3851-017 (20855) ~ US 385 at Cheyenne Wells 90 degree curve.  This project shall reconstruct the two 90 degree curves on US 385 in Cheyenne Wells between MP 150.33 and MP 150.73, as well as install sidewalk from W. 3rd Street S. to E. 4th Streel S. and will include storm sewer and drainage improvements. 

01Nov004.EBSx

FSA 052A-047 (21856) ~ This project is an intersection widening project. Salient features include new signals and caissons, street lighting, both overlay and full depth HMA, curb and gutter, raised median, and concrete drainage pipe. Located it Weld county. 

01Nov005.EBSx

November 8

ER 0361-118 (20744) ~ This project consists of Re-wetting of Munggins gulch on US 36 from MM 7 to MM 8 in Larimer county.  It will include a concrete box culvert, a tunnel, specialized river and environmental considerations, rock blasting to facilitate a rockfall ditch, paving and rockfall mitigation. 

Pending

Swipe table to see more content

Contact Us

  • Construction Prequalification
    Darrell Wells
    Contract Administrator
    [email protected]
    303-757-9215

View Bid Opportunities for State Transportation Projects

Construction Contract Bidding Opportunities
See current and future opportunities.

Innovative Contracting
See opportunities to bid on innovative design-build and construction manangement/general contractor (CM/GC) projects.

Colorado: The Official State Web Portal