B-2-0 Advertise Proper Wage Determination(s) for Advertisement

The B-2-0 Advertise Proper Wage Determination(s) for Advertisement flowchart and process guides listed on this page outlines the responsibilities of the Design Project Engineer/Project Manager and Region Civil Rights Office within the wage determination and advertisement discipline area.
Flowchart B-2-0 Identify Proper Wage Determination(s) for Advertisement outlines the roles of the Design Project Engineer/Project Manager and Region Civil Rights Office for inserting the correct wage determination in the contract specifications. Details and information provided in this flowchart is outlined below. Select the appropriate project delivery method.


Download B-2-0a Design-Bid-Build: Identify Proper Wage Determination(s) for Advertisement Flowchart

Download B-2-0b Construction Manager/General Contractor: Identify Proper Wage Determination(s) for Advertisement Flowchart

Process Guides

 Graphic Representation of mountains CDOT Design Project Engineer/Manager (Preconstruction)

Additional Resources