D-1-0 FTA Planning and Design: Project Setup for B2GNow

The D-1-0 FTA Planning and Design: Project Setup for B2GNow flowchart and reference guides outline the roles of the Subrecipient and the CDOT Civil Rights and Business Resource Center (CRBRC) during the B2GNow project setup phase for FTA planning and design contracts.
This is a graphic representation of the flowchart for D-1-0 FTA Planning and Design Project Setup for B2GNow. Text version available below.
Flowchart D-1-0 FTA Planning and Design: Project Setup for B2GNow outlines the roles of the Subrecipient and CDOT Civil Rights Business Resource Center for setting up B2GNow for FTA planning and design contracts. Details and information provided in this flowchart is outlined below.


Download D-1-0 FTA Planning and Design: Project Setup for B2GNow

Flowchart D-1-0 FTA Planning and Design: Project Setup for B2GNow

1. Start: The Subrecipient awards the contract to the Prime Consultant and provides a copy of the award to CDOT DTR.
2. CDOT Division of Transit and Rail (DTR) provides a copy of the award to the CDOT Civil Rights Business Resource Center (CRBRC)
3. The Subrecipient completes the FTA Project Setup for B2GNow/LCPtracker Google Form. (Figure 1-1)
4. The CRBRC sets up B2GNow for the project (Figure 1-2).
5. The process ends.