2019-12-19 Final Selection Announcement
US 550/160 Connection Design-Build
2019-9-26 RFP Final Addendum
2019-8-23 RFP Documents ADDENDUM 1
2019-8-23 22420 - US550_160 Design Build RFP Addendum 1 Memo
2019-8-23 22420 US 550-160-RFP Addendum 1 Change Tracking Log
2019-7-12 US 550/160 Connection Design-Build - FINAL RFP
Published Responses to Draft RFP Questions
US 550/160 Connection Design-Build SOQ Submitter List
US 550/160 Connection Design-Build - DRAFT RFP
US 550/160 Connection Design-Build Short List
US 550/160 Connection Design-Build - Revised RFQ for Addendum #1 - Replaces Original RFQ in its entirety.
US 550/160 Connection Design-Build - RFQ Addendum #1 Memo
US 550/160 Connection Design-Build - Request for Qualifications Posted March 15, 2019 RFQs Due - 4/26/2019 by 4:00pm MST UPDATE - Addendum #1 Issued - 4/15/2019
US 550 / 160 Connection Design Build - Request for Letters of Interest