Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Business
You are here:
  1. Home
  2. Business Center
  3. Design & Construction Project Support
  4. Construction Specifications
  5. 2023 Construction Specifications
  6. Sample Construction Project Special Provisions
  7. Revisions to Sections 300 thru 500
Revisions to Sections 300 thru 500 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications/sample-construction-project-special-provisions/section-300-500-revisions https://www.codot.gov/@@site-logo/siteLogo.png

Revisions to Sections 300 thru 500

Revision of Section 307 - Cement Treated Subgrade
Revision of Sections 307, 406 and 702 - Cold Asphalt Pavement (Recycle)
Revision of Section 308 - Subgrade Stabilization
Revision of Section 310 - Full Depth Reclamation of Hot Mix Asphalt Pavement
Revision of Section 401- Roller Pass Study - Leveling Course
Revision of Section 403 - Hot Mix Asphalt Ticket Collection
Revision of Section 405 - Heating And Repaving Treatment
Revision of Section 409 - Cape Seal
Revision of Section 409 - Double Chip Seal
Revision of Sections 409 and 702 - Micro-Surfacing
Revision of Section 412 - PCCP Shoulder Joints
Revision of Section 412 - Polyurethane Slab Jacking
Revision Of Sections 412 and 601 - Accelerated Pavement Repair Concrete
Revision of Section 420 - Media Filter Drain (MFD)
Revision of Section 506 - Geogrid Reinforcement for the Roadway Embankment
Revision of Section 522 - Duplex Coating System
Revision of Section 522 - Environmental Stain (Galvanized)

Tags:
  • Construction Specifications
Contact Us

CDOT Project Support 
[email protected]
If you are a CDOT employee, consultant, or contractor and would like to receive emails about the latest updates and revisions to these websites, please email us using the email above. Include your name, company name, and the email address that you would like to receive this information.


Bill Cornelius, P.E.
State Standards and Specifications Engineer
Unit Manager
[email protected]

Michele Kayen, P.E.
Specifications Engineer
[email protected]

David Kosmiski, P.E.
M Standards Engineer
[email protected]

Amin Fakhimalizad
Assistant M Standards Engineer
[email protected]

Vacant
Process and Innovation Engineer

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo