Specification Changes Under Consideration
Proposed Revisions to Existing Standard Special Provisions | ||
Log No. | Description | Due date for Comments |
207-1-fy25 | General comment regarding this specification change: This specification was completely rewritten and reviewed by Region Environmental, Design, and Construction Engineers, as well as reviewed by Keith Wakefield, Area Engineer at the time of rewriting. Keith Wakefield was the PE on the pilot projects, and this specification reflects his comments and suggestions that the former version, currently a Standard Special, did not. | 9.4.25 |
601-1-fy25 | Clarification of when field air can be added | 9.4.25 |
509-1-fy25 | Clarification to use AWS D1.1 for Hollow Structural Sections used on pedestrian bridges | 9.4.25 |
106-1-fy26 | An additional certification requirement indicating final assembly of the product occurred in the United States. This requirement is necessary due to the elimination of the 1983 Manufactured Products Waiver. 106 BABA more than 500k Craig Wieden 7.18.25 Support documentation An update to the manufactured products section of our Buy America specifications is necessary to comply with the recent elimination of the 1983 Manufactured Products Waiver. This revision will require an additional certification statement be provided by the manufacturer of a manufactured product, that the final assembly of the manufactured product occurred in the United States. This is in addition to a certification statement that any iron/steel used in the manufactured product is Buy America compliant. Additionally, language was added that requires the certification be provided before the manufactured product is installed or paid for. This specification will apply to those projects with $500K or more in federal-aid highway funding, with a construction phase federal funding obligation date on or after October 1, 2025. This revision was accepted by the Materials Advisory Committee meeting on 7/16/2025 through the standard presentation/voting approval process. |
9.4.25 |
106-2-fy26 | A modification to the existing standard special provision related to Buy America requirements for those projects with less than $500K in fed-aid highway funding is being presented. With the incorporation of the prior Buy America into the 2025 Standard Specifications book, which included the definitions section, definitions in the Standard Special are no longer needed as they are duplicated. The attached standard special provision deletes the definitions portion. This specification will apply to those projects with less than $500K in federal-aid highway funding or no federal-aid highway funding. This revision was accepted by the Materials Advisory Committee meeting on 7/16/2025 through the standard presentation/voting approval process. |
9.4.25 |
206-1-fy26 | To improve reporting projects engineers, increase safety, and reduce risk. | 9.4.25 |
Comments and proposals for revising or creating new special provisions from concerned parties will be considered. CDOT personnel should direct these to their Specification Committee Region or Staff Branch Representative. Current Committee members are listed below. A completed Specification Revision Submittal Form is required by the Specifications Unit, which can be obtained by clicking here. Contractors who are members of Colorado Contractors Association (CCA) should direct their comments to Eldon Strong at CCA. Others not formally represented may address their comments directly to the CDOT Standards and Specifications Unit at the address indicated below.
Chairman - Markos Atamo (Branch Manager, Construction Engineering Services)
Secretary - Michele Kayen (Specifications Engineer)
Region Representatives:
- Region 1 - Jack Thorpe
- Region 1 - Jeremy King
- Region 2 - Laurel Jones
- Region 3 - Kaitlyn Clark
- Region 4 - Chris Boespflug
- Region 5 - Bridget McDougall
Staff Representatives:
- Project Development - Ryan Sullivan-Hope
- Specifications - Bill Cornelius and Michele Kayen
- Area Engineers - Colleen King and Stacy DeWitt
- Bridge Branch - Greg Marcuson
- Contracts & Market Analysis - Markos Atamo
- Materials Branch - Vince Battista and Craig Wieden
- Traffic Engineering - Esayas Butta
- Maintenance - Tommy Humphrey
- FHWA - Armando Henriquez
- Attorney General Office - Justin Curry
Others Receiving Drafts for Comment:
- Colorado Contractors Association (CCA) - Jim Moody
Technical Committees:
- Alternate Delivery Program - Casey Valentinelli
- Bridge - Greg Marcuson
- State Hydraulics Advisory Committee (SHAC) - Michael Tanner
- Local Agency Round Table (LART) - Ryan Sorenson
- Project Delivery Advisory Committee (PDAC) - Coleen King and Stacey DeWitt
- Roadway Design Advisory Committee - Jerome Estes
- Survey Advisory Committee – Wes Loetz
- Water Quality Advisory Committee (WQAC) - Rachel Hansgen
- Joint Co-Op - CDOT/CCA
CDOT STANDARDS AND SPECIFICATIONS UNIT:
- CDOT Standards and Specifications Unit Manager
2829 W. Howard Pl., 3rd fl.
Denver, CO 80204
Telephone: 303-757-9474