Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
News
You are here:
  1. Home
  2. News
  3. 2021
  4. July 2021
  5. Assets
Navigation
  • CDOT Media Room
  • 2023
  • 2022
  • 2021
    • Glenwood Canyon News
    • January 2021
    • February 2021
    • March 2021
    • April 2021
    • May 2021
    • June 2021
    • July 2021
      • I-70 through Glenwood Canyon closure continues through the weekend as crews make progress in clearing mudslides
      • Assets
        • I-25 and County Line Bridge Closure
        • County Line Road Bridge: Construction Phases for the I-25 South Gap project graphic
        • 2021 Impaired Driving Fatalities - Highest Counties
        • Drinking? Don't mix with driving billboard
        • I've been drinking and wondering - Am I sober enough to driver graphic
        • I've been drinking, am I good to drive? It's not Complicated. Don't drink and drive graphic
        • Glenwood Canyon mudslides alternative route map
        • I-25 Exit 11 aerial view
        • Closure of Steele Street under viaduct - Central 70 project
        • Walsenburg ADA Ramps project map area
        • Region 3 Wrong Way Project Map from Fruita to Frisco
        • Closure of Eastbound I-70 from Brighton Boulevard to I-270
        • Northbound I-25/County Line Road off-ramp closure detour map
        • Northbound I-25/County Line Road off-ramp closure detour map near CO 105
        • I-25 detour route on the Frontage Road from East County Road 14 to East County Road 18
        • Detour map on I-25 between CO 60 to County Road 44
        • US 550 South of Durango paving operations project map
        • Pikeride bicycles
        • Traffic Shift - Purcell Boulevard closed at US 50 map area
        • Southbound I-25 and Upper Lake Gulch Road Underpass Closure project map
        • Elected officials at groundbreaking for the I-25/Exit 11 Interchange Improvement project
        • Governor Polis and Director Lew speaking at groundbreaking for the I-25/Exit 11 Interchange Improvement project
        • Culvert improvements at CO 115 Mile Point 42.41
        • Culvert improvements at CO 9 Mile Point 27.77
        • Motorcycle fatalities by year graph - 2016 to 2020
        • cell phone graphics of Don't Drive Distracted campaign
        • Motorcycle fatalities graph 2020
        • Career Fair Flier | Region 1 Maintenance
        • Mudslide near I-70 in Glenwood Canyon
        • Mudslide debris in Glenwood Canyon
        • Colorado Highway 7 (Lower) Project Map recommended closure schedule
        • Google Earth image of CO 7
        • US 6 map from /ci 119 to CO 58-CO 93 near Golden
        • US 550 Culvert Improvements map on the Million Dollar Highway
        • CO 9 project map from Fairplay to Hartsel
        • 2021 unbuckled fatalities - Highest Counties graph
        • Region 5 US 160 Pagosa Springs Culvert Replacement project location map
        • Closure of Westbound I-70 from I-270 to Colorado Boulevard
        • Manassa Main Street Enhancement Project map - New ADA ramps, sidewalks and curbs and gutters
        • San Luis Valley Project Celebration map in Alamosa
        • Don't let your night end like this photo booth examples
        • Glenwood Canyon mudslide water on the road
        • Glenwood Canyon mudslide over I-70 driving eastbound
        • Glenwood Canyon mudslide CDOT vehicle near rocks on the road
        • Glenwood Canyon mudslide crews assemble tractors for clean up
        • Glenwood Canyon mudslide tractor dumping mud during clean up
        • Glenwood Canyon mudslide continues over I-70 eastbound
    • August 2021
    • September 2021
    • October 2021
    • November 2021
    • December 2021
    • CSV Content Report January 31, 2023
  • Denver Metro/Central Colorado
  • Southeastern Colorado News
  • Northwestern Colorado News
  • Northeastern Colorado News
  • Southwestern Colorado News
  • Traffic Safety News
  • Statewide News
  • Statewide News Archive
  • CSV Content Report August 26, 2022
Assets https://www.codot.gov/news/2021/july-2021/assets https://www.codot.gov/@@site-logo/siteLogo.png

Assets

I-25 and County Line Bridge Closure
County Line Road Bridge: Construction Phases for the I-25 South Gap project graphic
2021 Impaired Driving Fatalities - Highest Counties
Drinking? Don't mix with driving billboard
I've been drinking and wondering - Am I sober enough to driver graphic
I've been drinking, am I good to drive? It's not Complicated. Don't drink and drive graphic
Glenwood Canyon mudslides alternative route map
I-25 Exit 11 aerial view
Closure of Steele Street under viaduct - Central 70 project
Walsenburg ADA Ramps project map area
Region 3 Wrong Way Project Map from Fruita to Frisco
Closure of Eastbound I-70 from Brighton Boulevard to I-270
Northbound I-25/County Line Road off-ramp closure detour map
Northbound I-25/County Line Road off-ramp closure detour map near CO 105
I-25 detour route on the Frontage Road from East County Road 14 to East County Road 18
Detour map on I-25 between CO 60 to County Road 44
US 550 South of Durango paving operations project map
Pikeride bicycles
Traffic Shift - Purcell Boulevard closed at US 50 map area
Southbound I-25 and Upper Lake Gulch Road Underpass Closure project map
  • 1
  • 2
  • 3
  • Next 20 items

 Contact CDOT

Resources
  • CDOT Media Room
  • CDOT YouTube Videos
  • Statewide News Archive
Stay Informed!

Travel Alerts header

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo