B-504 LRFD MSE/GRS Wall Worksheet DGNs

September 2016. These new worksheets in DGN format supersede all of the existing MSE worksheets issued in October 2013.
Title Type
All LRFD Wall Worksheets – DGN drawing files in a ZIP file File
B-504-AA, Application Guide, 09/2016 File
B-504-A1, Rail Anchor Slab with Block Facing MSE Wall 1:1 Soil Excavation or Fill, 09/2016 File
B-504-A2, Rail Anchor Slab with Block Facing MSE Wall 3/4:1 Soil Excavation, 09/2016 File
B-504-A3, Micropile A-Frame with Block Facing GRS Wall 3/4:1 Soil Excavation, 09/2016 File
B-504-A4, Rail Anchor Slab with Block Facing MSE Wall 1/2:1 Rock Excavation, 09/2016 File
B-504-A5, Rail Anchor Slab with Block Facing MSE Wall with 1/2:1 Rock Excavation, 09/2016 File
B-504-B1, Block Facing MSE Wall with Roadway Rail and 1:1 Soil Excavation, 09/2016 File
B-504-B2, Truncated Base Block Facing GRS Wall with Roadway Rail and 3/4:1 Soil Excavation or Fill, 09/2016 File
B-504-B3, Truncated Base Block Facing GRS Wall with Roadway Rail and 1/2:1 Soil Excavation, 09/2016 File
B-504-BB, MSE or GRS Wall Worksheet Checklist, 09/2016 File
B-504-C1, Block Facing MSE Wall with Roadway Rail and 1:1 Soil Excavation, 09/2016 File
B-504-C2, Truncated Base Block Facing MSE Wall for Backslope or Roadway with 3/4:1 Soil Excavation, 09/2016 File
B-504-C3, Truncated Base Block Facing MSE Wall for Backslope or Roadway with 1/2:1 Soil Excavation, 09/2016 File
B-504-CC, General Notes, 09/2016 File
B-504-D1, Rail Anchor Slab with Panel Facing MSE Wall 1:1 Soil Excavation or Fill, 09/2016 File
B-504-D2, Rail Anchor Slab with Panel Facing MSE Wall 3/4:1 Soil Excavation, 09/2016 File
B-504-D3, Micropile A-Frame with Panel Facing MSE Wall 3/4:1 Soil Excavation, 09/2016 File
B-504-D4, Rail Anchor Slab with Panel Facing MSE Wall 1/2:1 Rock Excavation, 09/2016 File
B-504-D5, Rail Anchor Slab with Panel Facing GRS Wall 1/2:1 Rock Excavation, 09/2016 File