Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. 4th Street Bridge Construction in Pueblo
  5. Assets
Assets https://www.codot.gov/projects/archived-project-sites/4thstreetbridge/assets https://www.codot.gov/@@site-logo/siteLogo.png

Assets

backfill thumbnail image backfill
Bent Concrete thumbnail image Bent Concrete
existing conditions thumbnail image existing conditions
Existing Lanes thumbnail image Existing Lanes
Existing Structure Site thumbnail image Existing Structure Site
Pier thumbnail image Pier
Piers And Caps thumbnail image Piers And Caps
Project Aerial thumbnail image Project Aerial
Project Limits thumbnail image Project Limits
Proposed Alignment thumbnail image Proposed Alignment
Proposed Alignment Aerial thumbnail image Proposed Alignment Aerial
Proposed Section thumbnail image Proposed Section
Pueblo Yard thumbnail image Pueblo Yard
Typical Sections thumbnail image Typical Sections

Tags:
  • Project: 4th Street Bridge
Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo