I-70 Viaduct Expansion Joint Repairs
Project Overview
In September 2008, the Colorado Department of Transportation (CDOT) began an expansion joint repair project on the I-70 viaduct from Brighton Boulevard to Colorado Boulevard. The project repaired or replaced 60 bridge expansion joints on the 45-year old structure, improve drainage and replace the bridge rail. The project was strictly a maintenance project designed to extend the life of the bridge and it is not connected with the I-70 Environmental Impact Statement (EIS).
The project was completed in the spring of 2011. American Civil Constructors, Inc. was the contractor for this project.