From June to October 2016, the Colorado Department of Transportation (CDOT) installed fiber reinforced polymer (FRP)—material used to rehabilitate and restore the strength of deteriorating structures—at the Sheridan Boulevard and Tennyson Street bridges at I-70. This work strengthened the bridge by repairing concrete structural pillars and bridge deck undersides. Crews also removed loose and damaged concrete before installing the FRP.

Project benefits included:

  • improved resiliency;
  • corrosion resistance; and
  • minimal required future maintenance.

Project Facts

  • Cost:
    $950,000

Project Team

  • Contractor(s): Restruction Corporation