You are here: Home Projects Archived Project Sites I-225 Ramp Safety Improvements Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/i225-rampsafety/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Closeup sawcutting for new auxiliary lane SB I-225.jpg Crews clearing and loading for auxiliary lane Phase 1.jpg Start of construction zone I-225.jpg Wide shot I-225 between Iliff and Parker.jpg Limit of construction zone I-225 Phase 1.jpg new auxiliary lane widening concrete paving.jpg auxiliary lane widening (1).jpg new auxiliary lane at the approach to Parker Road Exit (1).jpg shoulder widening in progress.jpg new auxiliary lane at the approach to Parker Road Exit.jpg south view of timber railings prior to installation.jpg crews pouring slip form barrier.jpg Crews installing timber barrier.jpg south view auxiliary lane in progress.jpg Excavating for dowel bar installation.jpg Crews widening pavement.jpg Filling retention pond footer.jpg Crews pumping concrete new retention pond I-225.jpg Crews finishing concrete paving of new auxiliary lane.jpg Prep concrete pouring new auxiliary lane.jpg Paving new auxiliary lane.jpg crews laying concrete auxiliary lane SB 225 at Parker Road.jpg Crews laying concrete pavement auxiliary lane 225 Parker Rd.jpg Crews laying concrete for section of auxiliary lane.jpg Newly constructed retaining wall retention pond at SB I225 at Parker Road.jpg New retaining wall with retention pond.jpg View of new auxiliary lane and final excavation.jpg South view construction of new retention ponds at 225 Parker Exit.jpg south view new auxiliary lane.jpg crews installing components for new overhead sign.jpg crews erecting sign during overnight hours.jpg crews erecting new sign.jpg Crews erecting new sign at Phase II location.jpg Collage landing page.JPG shoulder work at Phase II (1).jpg new sign at split 225 to 25 (1).jpg collage new barrier at the split.JPG wide view new barrier NB I-25 split.jpg night shot new barrier installation.jpg day shot new barrier.jpg crews working behind barrier at I-25 NB Phase II.jpg Phase II work at the split.jpg Overhead sign Phase II.jpg sign split.jpg barrier split.jpg South view of new extended northbound on ramp at Tamarac.jpg new paving covered for curing.jpg crews paving and sawcutting new pavement at NB I25.jpg NB I25 on ramp widening in progress.jpg barrier in place at 225 25 interchange.jpg barrier at left will be removed on march 2 2021.jpg area of widening showing existing barrier in place.jpg merge lanes at nb 25 showing widening.jpg permanent barrier NB I-25 on ramp.jpg current view off ramp SB 225 at Parker Road.jpg South view of new auxiliary lane on SB 225 approaching Parker Road.jpg Crews performing final grading auxiliary lane sb 225 at Parker Rd.jpg current view off ramp SB 225 at Parker Road.jpg newly widened and striped ramp at nb 25 tamarac (2).jpg new left two merge lanes onto I-25 northbound (2).jpg mainline 225 and NB 25 on ramp (2).jpg permanent barrier NB I-25 on ramp (2).jpg newly widened and striped ramp at nb 25 tamarac (3).jpg approach to S Parker Road Exit.jpg S Parker Road off ramp still closed.jpg Auxiliary lane still closed due to snow accumulation.jpg newly widened ramp I-25.jpg SB I-225 approach to Exit 4 showing new auxiliary lane.jpg safety barrier.jpg on ramp 25.jpg 225 to 25 extension.jpg widened off ramp to south parker road.jpg newly widened and improved SB I-225 off ramp at S Parker Rd.jpg new auxiliary lane between Iliff and Parker.jpg crews pouring making final improvements at the S Parker Rd off ramp.jpg newly widened and improved on ramp to I 25.jpg new widened on ramp.jpg new auxiliary lane on SB I-225 approaching Parker Road.jpg completed off ramp to S Parker Rd.jpg auxiliary lane complete.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/i225-rampsafety/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Closeup sawcutting for new auxiliary lane SB I-225.jpg Crews clearing and loading for auxiliary lane Phase 1.jpg Start of construction zone I-225.jpg Wide shot I-225 between Iliff and Parker.jpg Limit of construction zone I-225 Phase 1.jpg new auxiliary lane widening concrete paving.jpg auxiliary lane widening (1).jpg new auxiliary lane at the approach to Parker Road Exit (1).jpg shoulder widening in progress.jpg new auxiliary lane at the approach to Parker Road Exit.jpg south view of timber railings prior to installation.jpg crews pouring slip form barrier.jpg Crews installing timber barrier.jpg south view auxiliary lane in progress.jpg Excavating for dowel bar installation.jpg Crews widening pavement.jpg Filling retention pond footer.jpg Crews pumping concrete new retention pond I-225.jpg Crews finishing concrete paving of new auxiliary lane.jpg Prep concrete pouring new auxiliary lane.jpg Paving new auxiliary lane.jpg crews laying concrete auxiliary lane SB 225 at Parker Road.jpg Crews laying concrete pavement auxiliary lane 225 Parker Rd.jpg Crews laying concrete for section of auxiliary lane.jpg Newly constructed retaining wall retention pond at SB I225 at Parker Road.jpg New retaining wall with retention pond.jpg View of new auxiliary lane and final excavation.jpg South view construction of new retention ponds at 225 Parker Exit.jpg south view new auxiliary lane.jpg crews installing components for new overhead sign.jpg crews erecting sign during overnight hours.jpg crews erecting new sign.jpg Crews erecting new sign at Phase II location.jpg Collage landing page.JPG shoulder work at Phase II (1).jpg new sign at split 225 to 25 (1).jpg collage new barrier at the split.JPG wide view new barrier NB I-25 split.jpg night shot new barrier installation.jpg day shot new barrier.jpg crews working behind barrier at I-25 NB Phase II.jpg Phase II work at the split.jpg Overhead sign Phase II.jpg sign split.jpg barrier split.jpg South view of new extended northbound on ramp at Tamarac.jpg new paving covered for curing.jpg crews paving and sawcutting new pavement at NB I25.jpg NB I25 on ramp widening in progress.jpg barrier in place at 225 25 interchange.jpg barrier at left will be removed on march 2 2021.jpg area of widening showing existing barrier in place.jpg merge lanes at nb 25 showing widening.jpg permanent barrier NB I-25 on ramp.jpg current view off ramp SB 225 at Parker Road.jpg South view of new auxiliary lane on SB 225 approaching Parker Road.jpg Crews performing final grading auxiliary lane sb 225 at Parker Rd.jpg current view off ramp SB 225 at Parker Road.jpg newly widened and striped ramp at nb 25 tamarac (2).jpg new left two merge lanes onto I-25 northbound (2).jpg mainline 225 and NB 25 on ramp (2).jpg permanent barrier NB I-25 on ramp (2).jpg newly widened and striped ramp at nb 25 tamarac (3).jpg approach to S Parker Road Exit.jpg S Parker Road off ramp still closed.jpg Auxiliary lane still closed due to snow accumulation.jpg newly widened ramp I-25.jpg SB I-225 approach to Exit 4 showing new auxiliary lane.jpg safety barrier.jpg on ramp 25.jpg 225 to 25 extension.jpg widened off ramp to south parker road.jpg newly widened and improved SB I-225 off ramp at S Parker Rd.jpg new auxiliary lane between Iliff and Parker.jpg crews pouring making final improvements at the S Parker Rd off ramp.jpg newly widened and improved on ramp to I 25.jpg new widened on ramp.jpg new auxiliary lane on SB I-225 approaching Parker Road.jpg completed off ramp to S Parker Rd.jpg auxiliary lane complete.jpg