DS1 TML
Templates
Library Name: DS1
Library Description: Design Segment 1
********************************************************************************
Template: DS1-I25-10L
Description: 10 Lane (HOV Aux-Ultimate)
--------------------------------------------------
Layer: DS1-I25-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 1.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-HOV
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-LANE3
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 8.00 LT-EOS
Fixed -16.67% 22.00 LT-POSS
Right Backbone
Fixed -2.00% 1.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-HOV
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-LANE3
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 22.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-I25-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 1.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 14.00 LT-HOV
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-LANE3
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 8.00 LT-EOS
Right Backbone
Fixed -2.00% 1.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 14.00 RT-HOV
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-LANE3
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 8.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: DS1-I25-8L-AUX
Description: 8 Lane (Aux-Lane)
--------------------------------------------------
Layer: DS1-I25-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 10.00% 13.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-LANE3
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 8.00 LT-EOS-OUT
Fixed -16.67% 22.00 LT-POSS
Right Backbone
Fixed 10.00% 13.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-HOV
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-LANE3
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 22.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-I25-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 13.00 LT-EOS-IN
Fixed -2.00% 14.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-LANE3
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 8.00 LT-EOS-OUT
Right Backbone
Fixed -2.00% 13.00 RT-EOS-IN
Fixed -2.00% 14.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-LANE3
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 8.00 RT-EOS-OUT
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: DS1-I25-8L-HOV
Description: 8 Lane (HOV)
--------------------------------------------------
Layer: DS1-I25-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 1.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-HOV
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 12.00 LT-EOS
Fixed -16.67% 18.00 LT-POSS
Right Backbone
Fixed -2.00% 1.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-HOV
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 12.00 RT-EOS
Fixed -16.67% 18.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-I25-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 1.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 14.00 LT-HOV
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 12.00 LT-EOS
Right Backbone
Fixed -2.00% 1.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 14.00 RT-HOV
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 12.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: DS1-I25-6L
Description: 6 Lane
--------------------------------------------------
Layer: DS1-I25-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 10.00% 13.00 LT-EOS-IN
Fixed -2.00% 12.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 12.00 LT-EOS-OUT
Fixed -16.67% 18.00 LT-POSS
Right Backbone
Fixed 10.00% 13.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 12.00 RT-EOS-OUT
Fixed -16.67% 18.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-I25-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 13.00 LT-EOS-IN
Fixed -2.00% 14.00 LT-EOP-IN
Fixed -2.00% 12.00 LT-LANE1
Fixed -2.00% 12.00 LT-LANE2
Fixed -2.00% 12.00 LT-EOP-OUT
Fixed -2.00% 12.00 LT-EOS-OUT
Right Backbone
Fixed -2.00% 13.00 RT-EOS-IN
Fixed -2.00% 12.00 RT-EOP-IN
Fixed -2.00% 12.00 RT-LANE1
Fixed -2.00% 12.00 RT-LANE2
Fixed -2.00% 12.00 RT-EOP-OUT
Fixed -2.00% 12.00 RT-EOS-OUT
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B1-1L
Description: Ramp B1 1 lane
--------------------------------------------------
Layer: DS1-B1-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed 2.00% 15.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B1-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Right Backbone
Fixed 2.00% 15.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B1-2L
Description: Ramp B1 2 lane
--------------------------------------------------
Layer: DS1-B1-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B1-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B2-2L
Description: Ramp B2 2 lane
--------------------------------------------------
Layer: DS1-B2-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B2-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 8.00 LT-EOS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B2-4L
Description: Ramp B2 4 lane
--------------------------------------------------
Layer: DS1-B2-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 12.00 LT-EOP
Fixed -2.00% 8.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-LANE2
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B2-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 12.00 LT-EOP
Fixed -2.00% 8.00 LT-EOS
Right Backbone
Fixed 2.00% 12.00 RT-LANE1
Fixed 2.00% 12.00 RT-LANE2
Fixed 2.00% 12.00 RT-EOP
Fixed 2.00% 4.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B3-1L
Description: Ramp B3 1 Lane
--------------------------------------------------
Layer: DS1-B3-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 15.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B3-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 15.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B3-2L
Description: Ramp B3 2 Lane
--------------------------------------------------
Layer: DS1-B3-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B3-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B4-2L
Description: Ramp B4 2 Lane
--------------------------------------------------
Layer: DS1-B4-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B4-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Right Backbone
Fixed -2.00% 8.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: B4-3L
Description: Ramp B4 3 Lane
--------------------------------------------------
Layer: DS1-B4-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Fixed -16.67% 12.00 LT-POSS
Right Backbone
Fixed -2.00% 12.00 RT-EOP
Fixed -2.00% 8.00 RT-EOS
Fixed -16.67% 12.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-B4-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 12.00 LT-LANE1
Fixed 2.00% 12.00 LT-EOP
Fixed 2.00% 4.00 LT-EOS
Right Backbone
Fixed -2.00% 12.00 RT-EOP
Fixed -2.00% 8.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: DS1-Approach
Description: Approach
--------------------------------------------------
Layer: DS1-APPROACH-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 10.00 LT-EOS
Fixed -16.67% 4.00 LT-POSS
Right Backbone
Fixed -2.00% 10.00 RT-EOS
Fixed -16.67% 4.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-APPROACH-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed -2.00% 10.00 LT-EOS
Right Backbone
Fixed -2.00% 10.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
Template: DS1-Trail
Description: Trail
--------------------------------------------------
Layer: DS1-TRAIL-FG
Description: Finished Grade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 7.00 LT-EOS
Fixed -16.67% 2.00 LT-POSS
Right Backbone
Fixed -2.00% 7.00 RT-EOS
Fixed -16.67% 2.00 RT-POSS
Left Cut
Fixed 33.33% 9.00 LT-CUT
Left Fill
Fixed -33.33% 9.00 LT-FILL
Right Cut
Fixed 33.33% 9.00 RT-CUT
Right Fill
Fixed -33.33% 9.00 RT-FILL
--------------------------------------------------
Layer: DS1-TRAIL-SG
Description: Subgrade
FIXITY SLOPE WIDTH TC NAME
Left Backbone
Fixed 2.00% 7.00 LT-EOS
Right Backbone
Fixed -2.00% 7.00 RT-EOS
Left Cut
Left Fill
Right Cut
Right Fill
********************************************************************************
********************************************************************************