Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. State Highway 82 Maroon Creek Bridge
  5. Photos
Photos https://www.codot.gov/projects/archived-project-sites/maroon-creek-bridge/photos https://www.codot.gov/@@site-logo/siteLogo.png

Photos

5Segmentsout thumbnail image 5Segmentsout
A view of the Maroon Creek Bridge , looking towards Aspen , showing one of two piers with six cantilever segments and the form travelers in place for placement of the 7 th segment.  thumbnail image 6OUT
133Carbondalebridge08 thumbnail image 133Carbondalebridge08
133CarbondaleVetsMemorial08 thumbnail image 133CarbondaleVetsMemorial08
A1Low thumbnail image A1Low
A1micropiles thumbnail image A1micropiles
A4Lowftg thumbnail image A4Lowftg
Abutment1 thumbnail image Abutment1
Abutment0706 thumbnail image Abutment0706
bridge thumbnail image bridge
Bridge2 thumbnail image Bridge2
BridgeConstruction thumbnail image BridgeConstruction
Bridgepier thumbnail image Bridgepier
Cantilever2Grows thumbnail image Cantilever2Grows
Cantilever Progress 3-22-07  thumbnail image CantileverProgress3-20-07
Dec2007 thumbnail image Dec2007
Existing Maroon Creek Bridge design and conditions. thumbnail image Existing Bridge
Feb2008 thumbnail image Feb2008
FirstSegmentpoured thumbnail image FirstSegmentpoured
SH 82 Maroon Creek Bridge 2008  thumbnail image maroonbridge08
MaroonCreek thumbnail image MaroonCreek
SH 82 Maroon Creek Bridge 2008 thumbnail image MCbridgevalleyshot08
Oct2007 thumbnail image Oct2007
P3 thumbnail image P3
P3Cant2 thumbnail image P3Cant2
P3Cantilever thumbnail image P3Cantilever
Pier2 thumbnail image Pier2
Pier2closeup thumbnail image Pier2closeup
Pier2done thumbnail image Pier2done
Pier2FormTraveler thumbnail image Pier2FormTraveler
Pier 2 upstation traveler, downstation traveler on ground  thumbnail image Pier 2 Upstation
Pier 3 progress with abutment 4 in background  thumbnail image Pier3
Pier0322 thumbnail image Pier0322
pier0706 thumbnail image pier0706
Piers2_3 thumbnail image Piers2_3
PiersHoriz thumbnail image PiersHoriz
Sidewalk_Composite5large thumbnail image Sidewalk_Composite5large
Siteview51607 thumbnail image Siteview51607
SiteViewOct172006 thumbnail image SiteViewOct172006
View of the bridge from the trail intersection looking up-stream. On the far right is Abutment #1 with forms and shoring in place for the bridge approach slab.  thumbnail image TrailIntersectionView
TravelerLaunched thumbnail image TravelerLaunched
View of the up-station segment forms at the bottom of pier 2.  thumbnail image UpstationSegments
View of the up-station from traveler on pier 2. thumbnail image upstationTrafficView
Joe Elsen (center), CDOT Program Engineer, receives the ASBI award thumbnail image Maroon Creek Award Photo 2010
Posted January 2010 thumbnail image Maroon Bridge After 2008
Posted January 2010 thumbnail image Maroon Creek After 2008 #2

Tags:
  • Maroon Creek Bridge
  • Projects
Contact Information

Joe Elsen, P.E.
CDOT Program Engineer
970-384-3332
[email protected]

Ralph J. Trapani, P.E.
Deputy Project Manager, Parsons
970-618-8959
[email protected]

Nancy Shanks
CDOT Public Relations Office
970-385-1428
[email protected]

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo