Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. North I-25 EIS
  5. DEIS - Draft Environmental Impact Statement
  6. Package Concept Plans
Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • North I-25 EIS
      • Records of Decision
      • North I-25 Commuter Rail Update
      • Final EIS
      • DEIS - Draft Environmental Impact Statement
        • Public Comments
        • Agency Comments
        • DEIS Volume 1
        • DEIS Volume 2
        • Alternatives Development & Screening Report
        • Package Concept Plans
          • Front Cover
          • Back Cover
          • Pages 1-10
          • Pages 11-20
          • Pages 21-30
          • Pages 31-40
          • Pages 41-52
      • Corridor History
      • Public Involvement
      • The EIS Process
      • Project Team
      • Transit Technologies/Highway Options
      • Latest News / Media Room
      • RCC / TAC
      • Transit and Rail Program
Package Concept Plans https://www.codot.gov/projects/archived-project-sites/north-i-25-eis/deis-pdf/package-concept-plans https://www.codot.gov/@@site-logo/siteLogo.png

Package Concept Plans

Front Cover
Back Cover
Pages 1-10
Pages 11-20
Pages 21-30
Pages 31-40
Pages 41-52

Tags:
  • North I-25 EIS
  • Projects
Contact Us
  • Carol Parr
    Project Manager
    NEPA Program & Environmental Unit Manager
    CDOT Region 4
    970-350-2170
    Email Carol.

  • Jared Fiel
    Communications Manager
    Email Jared.
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo