US 160 Mile Post 136.61 Culvert Replacement
Project Facts
- Cost:
$960,000
From August to November 2016, crews removed an old culvert and installed a new 72-inch culvert on US 160, at mile post 136.61—just west of Pagosa Springs, near the Parelli entrance.