US 550 Alternatives

Project Status: Complete

File PDF document Alternative A Exhibit 1.1
Preliminary Alternative A from the FEIS, Feasibility Alternative 1B from the US 160 FEIS, additional design variations along the existing US 550 alignment (the "T" Series).
File PDF document Alternative F Exhibit 1.1
Alternative F Modified
File PDF document Alternative G Exhibit 1.1
Revised Alternative G Modified that avoids a gas well.
File PDF document Alternative 'East' Exhibit 1.1
The Eastern Realignment Alternative
File PDF document Alternate 'West' Exhibit 1.1
The Western Realignment Alternative