Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. US 550 Curb Ramps/Median Improvements, Durango
  5. Assets
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Repaving and Structural Repairs in Walsenburg
  • CO 93 Resurfacing between US 6 and 58th Ave
  • CO 64 & CO 13 Meeker Resurfacing
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • US 550 Curb Ramps/Median Improvements, Durango
      • Assets
        • durango signal improvements map.png
        • US 550 Project Location Map v1 6.9.pdf
        • Project Flier - US 550 Durango.docx.pdf
        • 22810_US 550 Camino del Rio Improvements Rendering_Exhibit.pdf
        • 22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_3.jpg
        • 22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_2.jpg
        • 22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_1.jpg
        • US 550 COmplete graphic.jpg
Assets https://www.codot.gov/projects/archived-project-sites/us550-curb-ramps-medians-durango/assets https://www.codot.gov/@@site-logo/siteLogo.png

Assets

durango signal improvements map.png
US 550 Project Location Map v1 6.9.pdf
Project Flier - US 550 Durango.docx.pdf
22810_US 550 Camino del Rio Improvements Rendering_Exhibit.pdf
22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_3.jpg
22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_2.jpg
22810_US 550 Camino del Rio Improvements Rendering_Exhibit_Page_1.jpg
US 550 COmplete graphic.jpg

Project News and Updates
  • Camino del Rio improvements start back up after winter shutdown Apr 01, 2022
  • Signal, median and curb improvements set to begin in Durango Aug 06, 2021
  • Project Flier - US 550 Durango.docx.pdf Aug 17, 2022
Project News and Updates - More…
E-Newsletters
  • CDOT Traffic Advisory - US 550 Durango Sep 15, 2022
  • CDOT Traffic Advisory - US 550 Durango Aug 08, 2022
  • CDOT Traffic Advisory - US 550 Durango Jun 10, 2022
  • CDOT Traffic Advisory - US 550 Durango May 20, 2022
  • CDOT Traffic Advisory - US 550 Durango May 13, 2022
E-Newsletters - More…
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo